Laserfiche WebLink
Section <br /> # Final Inspection Complies? Comments/Assumptions <br /> & Reci ID <br /> C403.2.2 HVAC systems and equipment ❑Complies <br /> [17127]3 capacity does not exceed calculated ❑Does Not <br /> loads. <br /> []Not Observable <br /> ❑Not Applicable <br /> C408.2.1 Commissioning plan developed by ❑Complies <br /> [F128]1 registered design professional or ❑Does Not <br /> approved agency. <br /> ❑Not Observable <br /> ❑Not Applicable <br /> C408.2.4 Preliminary commissioning report ❑Complies <br /> [F129]1 completed and certified by registered ❑Does Not <br /> design professional or approved <br /> ❑ <br /> agency. Not Observable <br /> ❑Not Applicable <br /> C408.2.5. Final commissioning report due to ❑Complies <br /> 4 building owner within 90 days of ❑Does Not <br /> [F130]1 receipt of certificate of occupancy. <br /> ❑Not Observable <br /> ❑Not Applicable <br /> C408.2.3. HVAC equipment has been tested to ❑Complies <br /> 1 ensure proper operation. ❑Does Not <br /> [F131]1 ❑Not Observable' <br /> ❑Not Applicable <br /> C406 Efficient HVAC performance, efficient ❑Complies <br /> [F134]1 lighting system, or on-site supply of ❑Does Not <br /> renewable energy consistent with <br /> what is shown the approved plans. ❑Not Observable' <br /> ❑Not Applicable <br /> Additional Comments/Assumptions: <br /> 1 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) <br /> Project Title: UBS- EVERETT Report date --0370411 <br /> Data filename: \\Cdpepc-fs-1\projects\UBS-\EVERETT, WA\PROJECT UBS-1172 1604 Hewitt Avenue, 6th Flr, Page 8 of 9 <br /> Everett, WA\PROJECT INFORMATION\Com Check\LTG 2012.cck -_ <br />