Laserfiche WebLink
3. Windows and doors have been destroyed. <br /> 4. The building is open to the public, is a harbor for vagrants, and has <br /> become an attractive nuisance to inquisitive minors in the area. <br /> 5. The roof of the building is rotted and requires replacing <br /> 6. The exterior wood components of the building and interior of the <br /> building lack protection from the weather elements. <br /> 7. There is dry rot and general dilapidation throughout the building <br /> generated by a lack of maintenance. <br /> 7. The yard is overgrown with vegetation. <br /> II. The Building Official has found that the building on the above described <br /> property may endanger the life, health, property or safety of the public and is rendered <br /> dangerous pursuant to the provisions of the Uniform Code for the Abatement of <br /> Dangerous Buildings Code, Sec. 302, noting the following: <br /> 1. The building exists in violation of specific requirements applicable to <br /> such buildings provided by the building regulations of this jurisdiction, <br /> as specified in the Building Code and Housing Code as adopted by <br /> Ordinance of this jurisdiction relating to the condition of buildings. <br /> 2. The building is a nuisance and a hazard to the public, an attractive <br /> nuisance to children, and a harbor for vagrants. <br /> 3. The building is in such a condition as to constitute a public nuisance <br /> known to the common law or in equity jurisprudence. <br /> III. The above-described building shall either be repaired in accordance with all <br /> current Building Code requirements and all other applicable City of Everett codes or <br /> demolished. <br /> IV. If the owners elect to repair the building in accordance with the current Building <br /> Code requirements, all required permits must be secured therefore, and the work <br /> physically commenced within sixty (60) days of the date of this Order. All work must <br /> be completed within ninety (90) days of the date of this Order. <br /> V. If the owners elect to demolish the building, all required permits shall be <br /> secured therefore within thirty (30) days of the date of this order. Such demolition <br /> must be completed within sixty (60) days from the date of this Order. <br />