My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3454-15 with Exhibits A- C
>
Ordinances
>
Ordinance 3454-15 with Exhibits A- C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 4:20:02 PM
Creation date
10/28/2015 2:38:47 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
Ordinance 3454-15 with Exhibits A- C
Date
10/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT COMPREHENSIVE PLAN <br />Tables <br />Table 1: Functional Classification of Roadways.....................................................................................................10 <br />Table is Level of Service Definitions.................................................................................................................... <br />zz <br />Table 3. Mode Split Targets for Regional Centers in Everett..................................................................................30 <br />Table 4: Pedestrian LOS—Sidewalk Requirements.............................................................................................. <br />42 <br />Table 5: Bicycle LOS—Facility Requirements....................................................................................................... <br />44 <br />Table 6: Transit LOS — Facility Requirements........................................................................................................47 <br />Table 7: Twenty Year Project List Example Projects..............................................................................................55 <br />Table 8: Costs of Everett Transportation Element (zo+ years)............................................................................... <br />57 <br />Table g: Planned Improvements to State -Owned Routes.....................................................................................61 <br />Appendices <br />Appendix A-1: Traffic Operations Level of Service <br />Appendix A -i: Project List <br />
The URL can be used to link to this page
Your browser does not support the video tag.