Laserfiche WebLink
EVERETT COMPREHENSIVE PLAN <br />Table 7: Twenty Year Project List Example Projects <br />Project Benefit to Everett Total Cost Cost to Everett Goal Met <br />7Examplects <br />Upgrades to improve safety <br />$193-198M <br />$36-41M 2,3,5 <br />owntown interchange improvements <br />and reduce congestion <br />00th Street SE HOV Access/Undercrossing <br />• NB Everett Mall Way to SB 1-5 Onramp <br />City Arterials <br />Example Projects <br />Upgrades to improve safety <br />$125-135M <br />$87-92M 2,3 <br />• W. Marine View Dr./Rucker Ave./41st St. Freight <br />and reduce congestion, bridge <br />• Broadway Bridge Replacement (#529/5a) <br />replacement <br />• Broadway Corridor Improvements <br />Example Projects <br />Safety improvements <br />$9-12M <br />$7-9M 2 <br />• BNSF RR safety improvements <br />• Local Roadway Safety Projects <br />• Safe Routes to Schools <br />Local Access <br />Example Projects: <br />Upgrades to improve safety <br />$18-22M <br />$18-22M 2,3 <br />• 106th Place SE Improvements <br />and reduce congestion <br />• 3rd Avenue SE Street Improvements <br />• Local Street Improvements <br />Pedestrian/Bicycle <br />Example Projects: <br />Improve safety and <br />$28-32M <br />$28-32M 1, 2, 4 <br />• Interurban Trail Bike/Ped Path Improvements <br />connectivity for cyclists, <br />• Bicycle Detection Signals <br />pedestrians, and those with <br />• ADA Signals <br />disabilities <br />Example Projects: <br />Transit vehicle upgrades and <br />$50-55M <br />$26-30M 1, 2, 4, 6 <br />• Bus Replacements 2015 - Approx. 6 HD Buses <br />reduced maintenance costs <br />• Implementation of State CTR Law <br />reduce SOV trips, safety and <br />• Broadway Corridor Improvements <br />connectivity improvements <br />TRANSPORTATION ELEMENT 55 <br />