Laserfiche WebLink
EVERETT COMPREHENSIVE PLAN <br />County and Boundary Review Board, and (b) to be fulfilled by existing facilities within these <br />specific planning areas. <br />Significant energy efficiency retrofits of city buildings and related facilities have occurred since <br />2009. As of 2011 this was reducing the City's carbon emissions by 586 metric tons of COze per <br />year. As these retrofits continue through all the various city buildings and facilities it was projected <br />that the city will reduce its COZe per year anywhere between 805 to 2,376 metric tons by 2030. <br />The City is considering relocating existing City services at Cedar Street facilities to provide <br />redevelopment opportunities for the Cedar Street properties. This could occur within the planning <br />period, but no decisions have been made regarding where the public services would be relocated. <br />(a) Inventory and location. See Figure 7. <br />(b) Forecast of future needs. <br />(c) Proposed locations of expansion facilities. Future expansions could occur at the existing <br />facilities identified in Figure 7. No new facilities have been proposed at this time. <br />(d) Six-year funding sources. Funding for general government facilities is principally from general <br />obligation debt (bonds) of the City of Everett. Other funding is from the City's general fund. <br />CAPITAL FACILITIES ELEMENT 30 <br />