Laserfiche WebLink
EVERETT COMPREHENSIVE PLAN <br />Objective 2.7 Establish land use patterns that encourage the efficient utilization of land, <br />energy resources, transportation facilities, public infrastructure, and the economic provision of <br />public services, and that further the goals of the other elements of the comprehensive plan. <br />Objective 2.8 Reinforce, maintain and enhance the desirable qualities of Everett's <br />neighborhoods. <br />Objective 2.9 Improve the stability, value, and physical appearance of blighted areas. <br />Objective 2.10 Provide guidance to be used in the development of ordinances, projects and <br />action programs that promote the long term stability and best interests of the Everett community. <br />Objective 2.11 Provide sufficient land area of varying land use intensities to accommodate a <br />population level that achieves a balance between supporting additional economic and job growth, <br />preservation of existing neighborhood quality, ability of the City to provide adequate services <br />and facilities, enhancement of community image, promoting affordable housing, and anticipating <br />land use needs created by demographic changes within the Everett community. <br />Objective 2.12 Population Growth Objective. The Land Use Element of the Everett <br />Comprehensive Plan shall provide adequate land area and land use densities to accommodate by <br />2035 a population of approximately 165,000 within the city limits (of 2015) and 50,000 in the <br />unincorporated MUGA. The Land Use Element shall provide adequate land area and land use <br />intensities within the Everett Planning Area to accommodate an overall population level of <br />215,000. Everett's 2035 population target within the city limits (of 2015) is 143,000. <br />Objective 2.13 Economic Growth Objective: The Land Use Element of the Everett <br />Comprehensive Plan shall provide adequate land area and land use intensities to accommodate <br />145,000 jobs within the city limits (of 2015), and approximately 8,300 in the unincorporated <br />MUGA, by 2035. The Land Use Element shall provide adequate land area and land use <br />intensities within the Everett Planning Area to accommodate an overall employment level of <br />153,300. Everett's 2035 employment target within the city limits (of 2015) is 140,000. <br />Objective 2.14 Inter jurisdictional Cooperation Objective: The City of Everett will participate <br />in the Population and Employment Reconciliation and Monitoring Process with Snohomish <br />County Tomorrow, other cities in Snohomish County, and Snohomish County. It is recognized <br />that not all comprehensive plans will be adopted at the same time, so there is the need to review <br />and monitor the comprehensive plan holding capacities over time and, at least initially, on an <br />annual basis. The purpose of the process will be to adjust the population and employment targets <br />based upon adopted local plan preferences. <br />Objective 2.15 Closely coordinate planning efforts with other city departments to ensure that <br />the community's interests represented by each department are considered in long-range planning <br />decisions. <br />LAND USE ELEMENT 20 <br />