Laserfiche WebLink
EVERETT COMPREHENSIVE PLAN <br />energy facilities, electrical power generating facilities, sewage treatment plants except for <br />industrial pretreatment for on-site uses, and composting facilities. <br />Landscaping: A "see through buffer" meeting the requirements of Type II landscaping as <br />described in the zoning code shall be planted along the Hardeson Road frontage within or <br />adjacent to the Merrill and Ring Creek stream corridor, as permitted by the regulations of <br />Section 37 of the zoning code. The requirements of Landscape Category D, as described in <br />the zoning code, shall apply to interior lot lines. As an alternative to these standards, the <br />property owner may propose a master landscaping plan for Planning Director approval for all <br />lots within the subject area that provides a landscaping treatment equivalent or superior to the <br />requirements described herein. <br />Policy 2.3.11 Adult use businesses, as defined by the Zoning Code, are considered compatible <br />with all of the industrial land use designations as designated on the Land Use Map, provided that <br />they meet the location criteria of the Zoning Code. Non -industrial land uses that are specifically <br />permitted in industrial zones by the Zoning Code shall be permitted as provided by the Zoning <br />Code. Such non -industrial uses are considered compatible with the industrial land use <br />designations of the Comprehensive Plan. If this policy is inconsistent with any other Industrial <br />Land Use Policy, then this policy shall control. <br />2.4 Metropolitan Center Land Use Policies <br />Consistent with the Vision 2040 Regional Growth Strategy, the area identified on Figure 2 is <br />considered the regionally designated Everett growth center / Metropolitan Center. This area <br />comprises areas in which the City has previously developed the Everett Station Area Plan <br />(2005), Downtown Plan (2006), Broadway Mixed Use Zone (2008) and the Core Residential <br />Area Standards (2008). The City will complete a subarea plan for the center after the 2015 <br />update of the Comprehensive Plan. The Center Plan will address population, housing and <br />employment targets, policies and potential land use regulations for the area, as well as all other <br />relevant items consistent with the PSRC Regional Center Plans Checklist. It will be incorporated <br />into the Comprehensive Plan in a future docket cycle. Until the center plan is completed after <br />2015, the planning documents identified above will guide development in the area. The City will <br />consider completing up -front State Environmental Policy Act (SEPA) review for the expanded <br />Metropolitan Center to encourage compact, high density development.' <br />The Everett Metropolitan Center is expected to experience significant growth and <br />redevelopment. Although the Center has been called out as a land use designation under the <br />commercial land use policies, it is and will continue to be a mixed-use district. The Metropolitan <br />Center policies encourage (i) redevelopment with a wide variety of office, governmental, retail, <br />professional service, and residential uses; (ii) a vibrant, people -oriented, compact and walkable <br />setting; (iii) an emphasis on increasing the residential composition of the center and (iv) <br />improving the public transportation system serving the center. As an interim measure before the <br />adoption of the subarea plan, the City proposes to amend the zoning regulations for the C-2ES <br />(Everett Station) zone, concurrent with the adoption of the comprehensive plan update, to add <br />' The Planned Action provisions of SEPA result in expedited review at the project state when the City completes a <br />Subarea Plan and Environmental Impact Statement addressing the impacts of future development. <br />LAND USE ELEMENT 26 <br />