Laserfiche WebLink
Q�r PUBL/CeORKS 0 <br /> February 2, 2017 (updated specifically for permit B1701-027) <br /> Randy Brown, Synthesis PLLC <br /> e-mails: randy.brown@synthesispllc.com <br /> Project: TI FOR NEW TENANT: JDS <br /> Job Addresses: 6201 ASSOCIATED BLVD B STE 103 <br /> Permit No: B1701-027 <br /> RE: ADDITIONAL CORRECTIONS FOR BUILDING PLAN REVIEW <br /> Dear Randy, <br /> The plans submitted for permit have been examined and you are advised that ADDITIONAL <br /> revisions may be necessary before a permit can be issued. Please review and respond to the <br /> comments below. Plan review will resume when the requested information is submitted. All <br /> required submittals must be of sufficient detail and information to ensure that the proposed <br /> structures will be constructed in compliance with all adopted codes, with two sets of drawings <br /> submitted for revisions. <br /> All revisions require the person delivering the drawings to replace revisions into the two review <br /> sets here at our offices. For significant revisions, please provide two full replacement sets. If <br /> the revisions are coming directly from the blue-printer, please make arrangements with them to <br /> print two replacement sets. <br /> General <br /> 1. Previous comment.- Please indicate the area under tenant improvement, and the <br /> occupancy calculations on sheet G1.1 on permit B1701-027, similar to what was <br /> submitted for permit B1701-014. <br /> Construction <br /> 1. The ceiling detail should show a 2 inch angle at the wall, per the Northwest Ceiling <br /> Bureau details on document 401. <br /> 2. Safety glazing should be shown on all door and window elevations as required by IBC <br /> section 2406.4. <br /> Accessibility <br /> 1. The toilet rooms should have a clear floor space and turning space shown which does <br /> not overlap the entry door swing, per ICC-A117.1-2009 sections 603.2.1 and 603.2.2. <br /> Energy <br /> 1. Previous comment. For permit B1701-027, please indicate the prescriptive method of <br /> building envelope compliance on sheet G1.1, to include detailed R-Values of new or <br /> modified exterior walls, roof-ceiling cavities, man-doors and garage doors, per WSEC <br /> section C402.1. <br /> a. In addition to the prescriptive path, there is also a semi-heated path, which <br /> requires documentation on the plans for the intent for use and heating of the <br /> space in WSEC section C402.1.1.1. Additional details and calculations should be <br /> submitted for indicating compliance with the code requirements of this section. <br /> CITY OF EVERETT PERMIT SERVICES 3200 CEDAR ST, EVERETT, WA 98201 425-257-8810 <br /> website: www.everettwa.gov/permit January 24, 2017 email. everettepsC@everettwa.gov <br />