Laserfiche WebLink
0 0 <br /> b. In addition to the prescriptive path, there is also a low energy path, which <br /> requires documentation on the plans for the intent for use and heating of the <br /> space per one of the four options summarized in WSEC section C402.1.1. <br /> 2. Previous comment.- Please include a PROJ-SUM sheet for permit B1701-027. <br /> 3. Previous comment.- Please include actual code section language on sheet G1.1 for <br /> interior lighting controls, sensors, and all other methods of compliance covered in <br /> electrical power and lighting systems per WSEC section C405. <br /> All codes cited refer to the 2015 International Building Code (IBC), the 2015 International <br /> Existing Building Code (IEBC), the 2015 International Property Maintenance Code (IPMC), the <br /> 2015 International Fire Code (IFC), the 2015 International Mechanical Code (IMC), and the <br /> 2015 Washington State Energy Code (WSEC), as amended by the State of Washington and <br /> adopted by the City of Everett. The current IBC referenced standard for accessible design is <br /> the 2009 "Accessible and Usable Buildings and Facilities" (ICC/ANSI A117.1). Federal ADA <br /> regulations and standards may be more restrictive. Compliance with these regulations is the <br /> responsibility of the owner of the building. <br /> Upon submittal of the drawings, your application will be given priority and plan review will <br /> recommence. If you have any questions, please call me at 425-257-8813. <br /> All required submittals shall be sufficient detail and contain sufficient information to ensure that <br /> the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> Me� <br /> Meg Haley, RA <br /> Plan Review Architect <br /> Permit Services, City of Everett, WA <br /> Direct: 425-257-8813 <br /> CITY OF EVERETT PERMIT SERVICES 3200 CEDAR ST, EVERETT, WA 98201 425-257-8810 <br /> website: www.everettwa.4ov/permit January 24, 2017 email: everetteps cDeverettwa.gov <br />