My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD PEDESTRIAN TUNNEL 2017-08-17
>
Address Records
>
W CASINO RD
>
3003
>
PEDESTRIAN TUNNEL
>
3003 W CASINO RD PEDESTRIAN TUNNEL 2017-08-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 10:37:14 AM
Creation date
8/17/2017 10:37:08 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
PEDESTRIAN TUNNEL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Ken Lowery AIA, NCARB, LEED AP BD+C <br /> Design Manager <br /> EMAIL klowery0brph.com <br /> DIRECT 425-760-6343 <br /> CELL 425-760-6343 <br /> BRPH 1 19020 33rd Ave W, Suite 530 1 Lynnwood, WA 98036 1 BRPH.com <br /> Named 2016 Best Company to Work For <br /> From: McGuire, Peter D <br /> Sent:Wednesday, March 15, 2017 3:34 PM <br /> To: Rybachuk, Ivan I <ivan.i.rybachuk@boeing.com> <br /> Cc:Tony Lee <TLee@everettwa.gov>;James Bronder<JBronder@everettwa.gov> <br /> Subject: RE: 81703-001 Building 40 Tunnel Shoring <br /> Hi Ivan — Could you or you're A&E respond to James regarding his question about <br /> fireproofing the steel? Thanks! <br /> Pefe, <br /> Pete McGuire <br /> The Boeing Company <br /> Site Service Planning <br /> Phone:425-238-3768 <br /> Service Request <br /> From:James Bronder [mailto:JBronder@everettwa.Rov] <br /> Sent: Wednesday, March 15, 2017 3:07 PM <br /> To: McGuire, Peter D<peter.d.mcguire@boeinR.com> <br /> Cc:Tony Lee <TLee@everettwa.gov> <br /> Subject: B1703-001 Building 40 Tunnel Shoring <br /> Hi Peter, <br /> I'm looking over the tunnel shoring steel on this project and I had a question regarding fireproofing that <br /> perhaps you, the architect, or BRPH could answer for us. <br /> For the new steel being installed, was there a consideration in providing fireproofing for the steel since <br /> it is a pedestrian passageway and could be considered a fire-protected egress requiring 2-hr fire rating? <br /> Feel free to contact me by phone or email at your earliest convenience. <br /> Thanks, <br /> James Bronder, PE <br /> City of Everett Public Works Department I Associate Engr. Plans Examiner <br /> 21 -, <br />
The URL can be used to link to this page
Your browser does not support the video tag.