My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 SE EVERETT MALL WAY SPORTSMANS WAREHOUSE 2017-08-17
>
Address Records
>
SE EVERETT MALL WAY
>
505
>
SPORTSMANS WAREHOUSE
>
505 SE EVERETT MALL WAY SPORTSMANS WAREHOUSE 2017-08-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 1:37:53 PM
Creation date
8/17/2017 1:37:11 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
505
Tenant Name
SPORTSMANS WAREHOUSE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02475— FOUNDATION STABILIZATION <br /> PART 1 GENERAL <br /> 1.01 RELATED DOCUMENTS <br /> A. Drawings and general provisions of Contract, including General Supplementary Conditions and <br /> Division-1 Specification sections, apply to work of this section. Other related sections are <br /> B. Section 02021- General Site Preparation and Grading. <br /> Section 02223- Earthwork. <br /> Section 02233 Watering. <br /> 1.02 DESCRIPTION OF WORK <br /> A. The work of this section consists of furnishing, loading, hauling, and placing of structural fill for use as <br /> ' site grading fill, to replace any unsuitable soils,as backfill around foundations, in utility trenches, and <br /> below footings and slabs. Structural fill is defined as all fill which will ultimately be subjected to <br /> structural loading, such as those imposed by footings, floor slabs, walkways, curb and gutter, all <br /> paved surfaces, or the work of other sections as shown and specified. <br /> 1 1.03 QUALITY ASSURANCE <br /> A. Reference, Unified Soil Classification System (USCS)as published by Bureau of Reclamation in the <br /> Earth Manual. <br /> 1.04 JOB CONDITIONS <br /> A. All usable excess material excavated under the work of other sections shall be utilized in the <br /> formation of embankments and other roadways. Wasting of materials will not be allowed. <br /> PART 2 MATERIALS <br /> 1 For material manipulations,a copy of the Soils Report is available from the General Contractor upon request. <br /> PART 3 EXECUTION <br /> 3.01 PROCEDURE <br /> A. Follow the recommendations of the soils report for the type, and requirement for the foundation <br /> stabilization. <br /> ' 3.02 PLACING <br /> A. Comply with the requirements of section Soils Report. <br /> IEND OF SECTION <br /> ' SPORTSMAN'S WAREHOUSE 02475- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.