Laserfiche WebLink
SECTION 02475— FOUNDATION STABILIZATION <br /> PART 1 GENERAL <br /> 1.01 RELATED DOCUMENTS <br /> A. Drawings and general provisions of Contract, including General Supplementary Conditions and <br /> Division-1 Specification sections, apply to work of this section. Other related sections are <br /> B. Section 02021- General Site Preparation and Grading. <br /> Section 02223- Earthwork. <br /> Section 02233 Watering. <br /> 1.02 DESCRIPTION OF WORK <br /> A. The work of this section consists of furnishing, loading, hauling, and placing of structural fill for use as <br /> ' site grading fill, to replace any unsuitable soils,as backfill around foundations, in utility trenches, and <br /> below footings and slabs. Structural fill is defined as all fill which will ultimately be subjected to <br /> structural loading, such as those imposed by footings, floor slabs, walkways, curb and gutter, all <br /> paved surfaces, or the work of other sections as shown and specified. <br /> 1 1.03 QUALITY ASSURANCE <br /> A. Reference, Unified Soil Classification System (USCS)as published by Bureau of Reclamation in the <br /> Earth Manual. <br /> 1.04 JOB CONDITIONS <br /> A. All usable excess material excavated under the work of other sections shall be utilized in the <br /> formation of embankments and other roadways. Wasting of materials will not be allowed. <br /> PART 2 MATERIALS <br /> 1 For material manipulations,a copy of the Soils Report is available from the General Contractor upon request. <br /> PART 3 EXECUTION <br /> 3.01 PROCEDURE <br /> A. Follow the recommendations of the soils report for the type, and requirement for the foundation <br /> stabilization. <br /> ' 3.02 PLACING <br /> A. Comply with the requirements of section Soils Report. <br /> IEND OF SECTION <br /> ' SPORTSMAN'S WAREHOUSE 02475- 1 <br />