Laserfiche WebLink
' 3.07 MAINTENANCE <br /> ' A. Protect surface of the completed base course against the loss of fine material or raveling by <br /> moisture when necessary, and maintain in a satisfactory and smooth condition until surfaced <br /> or accepted. <br /> ' 3.08 SUBGRADE AND SUBBASE SURFACE PREPARATION <br /> A. The existing finished sub-grade and sub-base surface shall be prepared for receiving <br /> aggregate course material. Surface shall be smooth and free of soft or spongy spots. These <br /> areas shall be repaired according to Section 02223 an/or 02021. Untreated Base Coarse <br /> surface shall be free of loose rock larger than 2". Surface shall be machine graded and <br /> smoothed immediately prior to placement of successive aggregate courses. <br /> 3.09 MACHINE GRADING <br /> ' A. See Section 02217 <br /> 3.10 AGGREGATE BASE COURSE THICKNESS SCHEDULE <br /> A. Paved Areas and Driveways............................................................................................8" minimum <br /> B. Building slab ................................................................See Soils Report for minimum requirements. <br /> 1 <br /> END OF SECTION <br /> SPORTSMAN'S WAREHOUSE 02606-3 <br />