B. Tack Coat: Apply to contact surfaces of previously constructed asphalt or Portland cement <br /> concrete and surfaces abutting or projecting into asphalt concrete pavement. Distribute at <br /> ' rate of 0.10 to 0.12 gal per sq.yd. of surface. Allow to dry until at proper condition to receive <br /> paving. <br /> 3.07 PLACING <br /> 1 A. General: Place asphalt concrete mixture on prepared surface, using self propelled laydown <br /> machine. Spread mixture at minimum temperature of 2650F-3050F. Place inaccessible and <br /> small areas by hand. Place each course to required grade, cross-section, and compacted <br /> thickness. <br /> B. Paver Placing: Place in strips not less than 10' wide, unless otherwise acceptable to <br /> Engineer. After first strip has been placed and rolled, place succeeding strips and extend <br /> rolling to overlap previous strips. <br /> C. Joints: Make joints between old and new pavements, or between successive day's work, to <br /> ensure continuous bond between adjoining work. Construct joints to have same texture, <br /> density and smoothness as other sections of asphalt concrete course. Clean contact <br /> surfaces and apply tack coat. <br /> 3.08 ROLLING <br /> ' A. General: Begin rolling when mixture will bear roller weight without excessive displacement. <br /> Compact Mixture with hot hand tampers or vibrating plate compactors in areas inaccessible to <br /> ' rollers. <br /> B. Breakdown Rolling: Accomplish breakdown or initial rolling immediately following rolling of <br /> joints and outside edge. Check surface after breakdown rolling, and repair displaced areas <br /> by loosening and filling, if required, with hot material. <br /> ' C. Second Rolling: Follow breakdown rolling as soon as possible,while mixture is hot. Continue <br /> second rolling until mixture has been thoroughly compacted. <br /> D. Finish Rolling: Perform rolling while mixture is still warm enough for removal of roller marks. <br /> Continue rolling until roller marks are eliminated and course has attained minimum of 96%of <br /> ASTM D-1559 (Marshall Test) laboratory density. <br /> E. Patching: Remove and replace paving areas mixed with foreign materials and defective <br /> areas. Cut-out such areas and fill with fresh, hot asphalt concrete. Compact by rolling to <br /> 1 maximum surface density and smoothness. <br /> F. Protection:After final rolling, do not permit vehicular traffic on pavement for a 24-hour period. <br /> G. Erect Barricades to protect paving from traffic for a 24-hour period. <br /> H. Bituminous Plant Mix Seal Coat: Where determined by the Engineer that the bituminous <br /> surface course is unacceptable due to material or construction defects or required by the <br /> contract documents, the Contractor shall place and compact a Bituminous Plant Mix Seal <br /> Coat over the bituminous surface course. The seal coat shall consist of a mixture of mineral <br /> aggregate and bituminous binder. <br /> 3.08 FIELD QUALITY CONTROL <br /> A. General: Test in-place asphalt concrete courses for compliance with requirements for <br /> thickness and surface smoothness. Repair or remove and replace unacceptable paving as <br /> directed by Engineer. <br /> B. Thickness: In-place compacted thickness will not be acceptable if exceeding allowable <br /> variation from required thickness of 1/4", plus or minus. <br /> C. Surface Smoothness:Test finished surface of each asphalt concrete course for smoothness, <br /> using 10' straightedge applied parallel with, and at right angles to centerline of paved area. <br /> Surfaces will not be acceptable if exceeding the tolerance of 3/8"for smoothness. <br /> 1. Check surface areas at intervals as directed by Engineer. <br /> D. Asphalt Content: Samples of the bituminous pavement mixture will be collected from the <br /> roadway and tested for both gradation and asphalt content. If the samples differ from the mix <br /> design submitted for approval by the Engineer,the actual mix design(as determined from the <br /> sample)will be evaluated. If the in place mix is found to be unacceptable, a plant mix seal <br /> coat will be required. The plant mix seal coat and tack coat will be installed at no additional <br /> cost to the owner. <br /> ' SPORTSMAN'S WAREHOUSE 02613 -3 <br />