Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Bid Item 8 - Roadway Excavation Incl. Haul I <br /> Measurement and Payment: Unit Price per Cubic Yard <br /> The unit price per cubic yard for excavation shall be full compensation for all labor, <br /> compaction, material, incidentals, tools, and equipment necessary to grade the site and <br /> remove asphalt concrete pavement, cement concrete, curbs and sidewalks where <br /> specifically indicated on the plans and as directed by the City. Also, incidental to this Bid <br /> item is excavation and removal of any aggregate base material and site grading of soil <br /> material necessary to reach design elevations for subgrade of restoration paving or finished <br /> elevation of site grading. Sawcutting of asphalt or concrete pavement is also incidental to <br /> this bid item. <br /> All materials and items of work required by the Plans, Standard Specifications, Special and <br /> Standard Provisions, or otherwise necessary for complete asphalt concrete pavement <br /> replacement that are not specifically listed among the bid items in the proposal shall be <br /> considered incidental to the listed bid items. No further payment will be made. <br /> Bid Item 9 - Sheeting, Shoring, Bracing, and Noise Wall Protection at R4 Site ' <br /> Measurement and Payment: Lump Sum <br /> Measurement for sheeting, shoring, bracing, and noise wall protection will be based on the 11 <br /> percentage of total Work complete, by dollar value, at the time of measurement. <br /> Payment for sheeting, shoring, bracing, and noise wall protection will be made at the <br /> measured percentage amount for the pay period times the lump sum amount bid. Said <br /> payment will be complete compensation for all equipment, labor, materials, hauling, <br /> planning, design, engineering, submittals, furnishing and constructing, and removal and <br /> disposal of such temporary sheeting, shoring, and bracing completed as required under the <br /> provisions of any permits and in the requirements of OSHA and RCW Chapter 49.17 <br /> required to complete this item of Work in conformance with the Contract Documents. It <br /> also includes complete compensation for all equipment, labor, materials, hauling, planning, <br /> design, engineering, submittals, and any other work required to protect the noise wall for <br /> the duration of construction in conformance with Contract Documents. Contactor shall <br /> submit shoring plan within 10 working days of notice to proceed. <br /> Bid Item 10 - Sheeting, Shoring, and Bracing at R39 Site I <br /> Measurement and Payment: Lump Sum <br /> Measurement for sheeting, shoring, and bracing will be based on the percentage of total I <br /> Work complete, by dollar value, at the time of measurement. <br /> Payment for sheeting, shoring, and bracing will be made at the measured percentage <br /> amount for the pay period times the lump sum amount bid. Said payment will be complete 1 <br /> compensation for all equipment, labor, materials, hauling, planning, design, engineering, <br /> submittals, furnishing and constructing and removal and disposal of such temporary <br /> sheeting, shoring, and bracing completed as required under the provisions of any permits <br /> and in the requirements of OSHA and RCW Chapter 49.17 required to complete this item of <br /> Work in conformance with the Contract Documents. Contactor shall submit shoring plan <br /> within 10 working days of notice to proceed. <br /> Bid Item 11 - Dewatering <br /> Measurement and Payment: Lump Sum <br /> Measurement for dewatering will be based on the percentage of total Work complete, by <br /> dollar value, at the time of measurement. <br /> Payment for dewatering will be made at the measured percentage amount for the pay <br /> period times the lump sum amount bid. Said payment shall be complete compensation for <br /> Sewer Regulators R4 and Division B—BID ITEM DESCRIPTIONS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-6 <br />