Laserfiche WebLink
ICITY OF EVERETT SPECIAL PROVISIONS <br /> Ielevations and other information necessary for production of the Record Drawing (As- <br /> Constructed) documents meeting the requirements defined in RECORD DRAWINGS of <br /> I these Special Provisions. <br /> Bid Item 5 - Traffic Control Labor <br /> Measurement and Payment: Unit Price per Hour <br /> IThis unit price bid item includes all costs associated with traffic control labor (for flagging <br /> effort only) as identified in Section 1-10.3(4) of the Special Provisions. The Contractor shall <br /> furnish all personnel for flagging to control traffic, including pedestrians, during construction <br /> I operations in accordance with Section 1-10 of the Standard Specifications, the drawings, <br /> approved traffic control plans, as directed by the City and these Special Provisions. <br /> I Bid Item 6 - Maintenance and Protection of Traffic Control <br /> Measurement and Payment: Lump Sum <br /> This lump sum bid item includes the maintenance and protection of traffic control measure <br /> I materials, tools, and equipment necessary and incidental in accordance with Section 1- <br /> 10.3(2) of the Special Provisions, including but not limited to, signs, barricades, cones, <br /> flashers, reader boards, and temporary pavement markings. Also included is providing <br /> I traffic control supervisor, coordination with the local businesses to communicate information <br /> involving parking, street access or traffic issues, temporary concrete barrier including all <br /> costs for furnishing, placing, maintaining, replacing and cleaning barrier delineation, and <br /> I temporary impact attenuator including all costs for installation, maintenance, and final <br /> removal. <br /> Measurement for maintenance and protection of traffic control shall be the ratio of the <br /> I number of working days completed to the total number of working days authorized in the <br /> Contract. <br /> Bid Item 7 - Removal of Structures and Obstructions <br /> IMeasurement and Payment: Lump Sum <br /> No specific unit of measurement shall apply to the lump sum item for Removal of Structures <br /> I and Obstructions. <br /> Removal of Structures and Obstructions shall include the removal, haul, and disposal of all <br /> structures and obstructions that impede construction, including salvage, recycling, and/or <br /> I disposal; removal and disposal of piping, structures and appurtenances; and abandonment <br /> in place of piping, structures and appurtenances, including CDF necessary for filling piping. <br /> This shall also include the removal and subsequent replacement in kind of drainage <br /> structures that impede construction progress or are damaged by the Contractor. <br /> IThis bid item shall include abandonment of existing water mains as shown on the Plans, <br /> including cutting, draining water and properly disposing, and plugging pipe at each end with <br /> I a minimum of 2-feet of Commercial concrete or CDF. Include the concrete or CDF work <br /> with this work with no direct compensation being made. Abandon existing mains in place <br /> where possible. Include cost of removal, hauling, and disposal of existing main with this bid <br /> item when abandoning in place is not possible. Include closing existing valves and <br /> plugging where noted, and removing the lids and valve boxes. <br /> This bid item shall include removal of two trees and 70 lineal feet of fence as shown on the <br /> Plans. <br /> IDemolition and removal of pavement and sidewalks are included in other bid items. <br /> I <br /> Sewer Regulators R4 and Division B—BID ITEM DESCRIPTIONS May 2017 <br /> I R39 Modifications <br /> WO No—UP3633 SP-5 <br />