Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> status and progress shall relieve the Contractor of responsibility for planning and <br /> managing construction Work in conformance with the construction schedule. , <br /> 1-08.4(2) Special Construction Constraints <br /> (*AAAAk) <br /> Based)on an Agreed Order between the City of Everett and Washington Department of <br /> Ecology, this project must be physically complete no later than December 31, 2017. <br /> Contractor shall schedule the work and provide adequate forces to complete <br /> construction and commissioning of all work except site restoration, paving and ' <br /> demobilization. <br /> Due to the complexity and criticality of these existing facilities and the proposed <br /> improvements, the sequence and implementation of the work shall be carefully <br /> planned and executed. The City has included information in the project documents <br /> that suggests a recommended sequence of the work together with corresponding flow <br /> rate values for routing/bypassing dry weather and wet weather sewer flows. Plan the <br /> work to minimize risk of sewer spills and complete the work efficiently and quickly. <br /> 1-08.5 Time for Completion <br /> Delete all of 1-08.5 and substitute the following: <br /> 1-08.5(1) General <br /> The Contractor shall complete all physical Contract Work within the number of <br /> "working days" stated in the Contract Provisions or as extended by the Engineer in <br /> accordance with Section 1-08.8. Every day will be counted as a "working day" <br /> unless it is a nonworking day or an Engineer determined unworkable day. A <br /> nonworking day is defined as a Saturday, a Sunday, a whole or half day on which <br /> the Contract specifically prohibits Work on the critical path of the Contractor's <br /> approved progress schedule, or one of these holidays: January 1, the third <br /> Monday of January, the third Monday of February, Memorial Day, July 4, Labor 111Day, November 11, Thanksgiving Day, the day after Thanksgiving, and Christmas <br /> Day. When any of these holidays fall on a Sunday, the following Monday shall be <br /> counted a nonworking day. When the holiday falls on a Saturday, the preceding <br /> Friday shall be counted a nonworking day. The days between December 25 and <br /> January 1 will be classified as nonworking days. <br /> An unworkable day is defined as a half or whole day the Engineer declares to be <br /> unworkable because of weather or conditions caused by the weather that <br /> prevents satisfactory and timely performance of the Work shown on the critical <br /> path of the Contractor's approved progress schedule. Other conditions beyond the <br /> control of the Contractor may qualify for an extension of time in accordance with <br /> Section 1-08.8. <br /> Contract Time shall begin on the effective date of the Notice to Proceed. The <br /> Contract Documents may specify another starting date for Contract Time, in which <br /> case, Contract Time will begin on the starting date the Contract Documents <br /> specify. <br /> Each working day shall be charged to the Contract as it occurs, beginning on the <br /> effective date of the Notice to Proceed, unless otherwise provided in the Contract <br /> Documents, until the Contract Work is physically complete. Each week the <br /> Engineer will provide the Contractor a statement that shows the number of <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-100 I <br />