Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> working days: (1) charged to the Contract the week before; (2) specified for the <br /> physical completion of the Contract; and (3) remaining for the physical completion <br /> of the Contract. The statement will also show the nonworking days and partial or <br /> whole day the Engineer declares as unworkable. Within 14 calendar days after <br /> the date of each statement, the Contractor shall file a written protest of any <br /> alleged discrepancies in it. To be considered by the Engineer, the protest shall be <br /> in sufficient detail to enable the Engineer to ascertain the basis and amount of <br /> ' time disputed. By not filing such detailed protest in that period, the Contractor <br /> shall be deemed as having accepted the statement as correct. If the Contractor <br /> elects to work ten hours a day and four days a week (a 4-10 schedule) and the <br /> fifth day of the week in which a 4-10 shift is worked would ordinarily be charged as <br /> a working day then the fifth day of that week will be charged as a working day <br /> whether or not the Contractor works on that day. <br /> The Engineer will give the Contractor written notice of the Physical Completion <br /> Date for all Work the Contract requires. That date shall constitute the Physical <br /> Completion Date of the Contract, but shall not imply the City's acceptance of the <br /> Work or the Contract. <br /> The Engineer will give the Contractor written notice of the Completion Date of the <br /> Contract after all the Contractor's obligations under the Contract have been <br /> performed by the Contractor. The following events must occur before the <br /> Completion Date can be established: <br /> 1. The physical Work on the project must be complete; and <br /> 2. The Contractor shall furnish all documentation required by the Contract <br /> and required by law, to allow the City to process final acceptance of the <br /> Contract. <br /> The following documents must be received by the Engineer prior to establishing a <br /> Completion Date: <br /> a. Certified payrolls. <br /> b. Material Acceptance Certification Documents. <br /> c. Annual Report of Amounts Paid as MBE/WBE Participants. <br /> d. Final Contractor Voucher Certification. <br /> ' e. Copies of the approved "Affidavit of Prevailing Wages Paid" for the Contractor <br /> and all Subcontractors. <br /> ' Supplement 1-08.5 by adding the following: <br /> 1-08.5(2) Substantial Completion <br /> (******) <br /> When the Contractor considers the Work to be Substantially Complete and ready for <br /> its intended use, it shall give Notice to the City's Representative. The Notice shall <br /> include an itemized list of remaining incomplete Work. If the City's Representative <br /> determines the Work is not substantially complete, it will so notify the Contractor in <br /> writing, identifying the reasons for such a determination. If the City's Representative <br /> finds the Work substantially complete, it will meet with the Contractor to (1) prepare a <br /> Punch List of incomplete items of Work; (2) define the division of responsibility <br /> between City and Contractor with respect to security, operation, maintenance, heat, <br /> utilities, insurance, and warranties; and (3) describe other issues related to acceptance <br /> of the substantially completed Work. <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.