CITY OF EVERETT SPECIAL PROVISIONS I <br /> Bid Item 15 - Type 2 Saddle Manhole, 108-inch Diam. I <br /> Measurement and Payment: Unit Price per Each <br /> Measurement for furnishing and installing Type 2 Saddle Manhole, 108-inch Diam., will be <br /> per each, installed in conformance with the Contract Documents. <br /> Payment for furnishing and installing Type 2 Saddle Manhole, 108-inch Diam., will be made <br /> at the unit price bid per each, which will be complete compensation for all labor, equipment, <br /> materials, hauling, locating all existing utilities and potholing in advance for horizontal and <br /> vertical location, excavation, removal and disposal of waste material, placement and <br /> compaction of foundation material, the manhole base with required saddle cut-outs and <br /> stub, manhole barrel, manhole grade rings, manhole rungs or ladder, manhole frame and <br /> cover, channeling the manhole, installation, final adjustment of structure to grade, <br /> appurtenances, connections to existing and new pipes, stockpile and placement of <br /> subsequent backfill (native) materials, compaction, cleaning, temporary pavement patching, <br /> etc. required to complete the Work in conformance with the Contract Documents. Select <br /> imported backfill materials are included in other bid items. <br /> Bid Item 16 - Type 1 Catch Basin <br /> Measurement and Payment: Unit Price per Each <br /> Measurement for furnishing and installing Type-1 catch basin will be per each for each <br /> Type-1 catch basin installed in conformance with the Contract Documents. <br /> Payment for furnishing and installing Type-1 catch basin will be made at the unit price bid <br /> per each, which will be complete compensation for all labor, equipment, materials, hauling, <br /> locating all existing utilities and potholing in advance for horizontal and vertical location, <br /> excavation, removal and disposal of waste material, furnishing and compaction of <br /> foundation material, Type-1 catch basin, frame and grate, installation, adjustment of frames <br /> to grade, appurtenances, connections to new storm sewers, stockpile and placement of <br /> subsequent backfill (native) materials, compaction, cleaning, temporary pavement patching, <br /> etc. required to complete the Work in conformance with the Contract Documents. Select <br /> imported backfill materials are included in other bid items. <br /> Bid Item 17 - Type 2 Catch Basin with Gas Trap <br /> Measurement and Payment: Unit Price per Each II <br /> Measurement for furnishing and installing Type-2 catch basin with gas trap will be per each <br /> for each Type-2 catch basin with gas trap installed in conformance with the Contract11 <br /> Documents. <br /> Payment for furnishing and installing Type-2 catch basin with gas trap will be made at the <br /> unit price bid per each, which will be complete compensation for all labor, equipment, I <br /> materials, hauling, locating all existing utilities and potholing in advance for horizontal and <br /> vertical location, excavation, removal and disposal of waste material, foundation material, <br /> Type-2 catch basin with gas trap, frame and grate, installation, adjustment of frames to <br /> grade, appurtenances, connections to new storm sewers, stockpile and placement of <br /> subsequent backfill (native) materials, compaction, cleaning, temporary pavement patching, <br /> etc. required to complete the Work in conformance with the Contract Documents. Select <br /> imported backfill materials are included in other bid items. <br /> Bid Item 18 - R4 Regulator Vault <br /> Measurement and Payment: Lump Sum I <br /> Measurement for R4 Regulator Vault Work will be based on the percentage of total Work <br /> complete at the time of measurement. <br /> 111 <br /> Sewer Regulators R4 and Division B—BID ITEM DESCRIPTIONS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-8 <br />