Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Payment for furnishing and installing R4 Regulator Vault will be made at the measured <br /> percentage amount for the pay period times the lump sum amount bid. Said payment shall <br /> be complete compensation for all labor, equipment, and materials, including hauling, <br /> excavation, removal and disposal of waste material, furnishing, placing and compacting <br /> foundation and bedding material, placing and compacting native backfill in all excavated <br /> areas, regulator vault structure, weir plate and weir wall, installation, conduit and junction <br /> box, appurtenances, connections to new combined sewers, cleaning, etc. required to <br /> complete the Work in conformance with the Contract Documents. Select imported backfill <br /> materials are included in other bid items. <br /> Bid Item 19 - R39 Regulator Modifications <br /> Measurement and Payment: Lump Sum <br /> Measurement for R39 regulator modifications shall be based on the percentage of total <br /> Work complete, by dollar value, at the time of measurement. <br /> Payment for R39 regulator modifications will be made at the measured percentage amount <br /> ' for the pay period times the lump sum amount bid. Said payment shall be complete <br /> compensation for all labor, equipment, materials, hauling, FRP molded grating, concrete <br /> weir, slide gates, concrete, manhole rims and covers, manhole risers, any necessary <br /> bypass pumping, appurtenances, cleaning, and cleanup, etc., required to complete R39 <br /> regulator modifications in conformance with the Contract Documents. <br /> Bid Item 20 - Ductile Iron Pipe For Water Main, 8-Inch Diam. <br /> Measurement and Payment: Unit Price per Linear Foot <br /> Per linear foot pipe measurement shall be based on the slope distance from point to point. <br /> The point of beginning or ending of measurement in any particular run of pipe shall be the <br /> horizontal intersection of the centerline of the pipe measured with the centerline of the <br /> intersection pipe, or with the beginning or ending of any new linear length of valves or <br /> couplings contained within the measured length. At changes in pipe size connected by a <br /> reducer, the point of measurement shall be taken as the midpoint of the reducer. <br /> The unit contract price for Ductile Iron Pipe For Water Main, 6-Inch Diam., shall constitute <br /> full compensation for all labor, materials, tools and equipment necessary to furnish and <br /> install the pipe, restrained joints (where shown on the Plans or as required by the Standard <br /> Specifications and Special Provisions), and all fittings, including tees, crosses, reducers, <br /> couplings, and sleeves required for complete installation along the run of each pipe size, as <br /> shown on the Plans and specified herein, and additionally, shall include, but not be limited <br /> to, the following: <br /> 1. Removal of structures or obstructions not specifically covered under other Bid Items. <br /> This shall include, but not be limited to, removal and disposal of thrust blocks, <br /> miscellaneous landscaping, and sod as indicated on the Plans. <br /> ' 2. All required potholing to verify locations of water service crossings and existing utilities. <br /> 3. Utility or light pole protection in conformance with the requirements of the applicable <br /> utility including, if necessary, arranging for the utility to protect poles and paying the <br /> associated fees. <br /> 4. Trench excavation and dewatering, installation of pipe, furnishing, placing and <br /> compacting backfill for pipe bedding, furnishing, placing and compacting suitable <br /> native material for trench backfill and placing and compacting imported backfill <br /> material. <br /> 5. Steel sheeting for covering open excavations left overnight to protect public from injury <br /> and property damage. <br /> 6. Maintenance, restoration and/or relocation, if required, of existing culverts, storm <br /> drainage pipe, other utilities and structures affected by construction that are to remain. <br /> Sewer Regulators R4 and Division B—BID ITEM DESCRIPTIONS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-9 <br />