My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> established schedule of working hours, the City will not charge the Contractor for <br /> associated inspection costs. <br /> The Contractor shall be compensate the City for the actual costs of engineering, <br /> inspection, general supervision, right-of-way costs, permit fees, overhead expenses, <br /> and any other ascertainable direct costs to the City that are directly chargeable to the <br /> Work and that accrue during the period of such extension. The actual costs do not <br /> include charges for final inspection and preparation of the final payment by the City. <br /> 1-09.9(6) Retainage <br /> Pursuant to RCW Chap. 60.28, a sum of five percent(5%) of the monies earned by the <br /> Contractor will be retained from progress estimates. In addition to protecting the <br /> interests of those identified in RCW Chap. 60.28, such retainage will be used as a trust <br /> fund for the protection of the City. <br /> At the option of the Contractor, monies retained under the provisions of RCW 60.28 will <br /> I be: <br /> 1. Retained in a fund by the City, or <br /> 2. Deposited by the City in an interest-bearing escrow account in a bank, mutual <br /> saving bank, or savings and loan association. Interest on monies so retained <br /> shall be paid to the Contractor in accordance with requirements of this <br /> section. Deposits are to be in the name of the City and may not be withdrawn <br /> without the City's written authorization. The City will issue a check <br /> representing the sum of the monies reserved, payable to the bank or trust <br /> company. Such check shall be converted into bonds and securities chosen by <br /> the Contractor as the interest accrues. <br /> The Contractor shall designate the option desired at the time the Contract is executed. <br /> If the Contractor in chooses option 2, deposit in escrow account, Contractor agrees to <br /> assume full responsibility to pay all costs that may accrue from escrow services, <br /> brokerage charges or both, and further agrees to assume all risks in connection with <br /> the investment of the retained percentages in securities. <br /> Retainage will be released when all of the following conditions are satisfied: <br /> 1. Sixty (60) days have elapsed following the completion of all Work specified in <br /> the Contract; and <br /> 2. The Contractor fulfilled all of all obligations of the Contractor under the <br /> Contract, including, but not limited to, the Contractor's furnishing all <br /> documentation required by Contract and law; and <br /> 3. A release has been obtained from the Washington State Department of <br /> Revenue; and <br /> 4. Affidavits of Wages Paid for the Contractor and all Subcontractors are on file <br /> with the City (RCW 39.12.040); and <br /> 5. A release has been obtained from the Washington State Department of Labor <br /> & Industries and the Washington State Employment Security Department; <br /> and <br /> 6. All claims, as provided by law, filed against the retainage have been resolved. <br /> In the event claims are filed and provided the conditions one through five are <br /> met, the Contractor will be paid the retained percentage less an amount <br /> sufficient to pay any such claims together with a sum determined by the City <br /> sufficient to pay the cost of claims and attorney's fees. <br /> Sewer Regulators R4 and Division 1 -GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No-UP3633 SP-117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.