My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-09.11 Disputes and Claims <br /> Delete 1-09.11 and substitute the following: 1 <br /> 1-09.11(1) Disputes <br /> (******) <br /> When a Dispute occurs during the Contract, the Contractor shall pursue resolution <br /> through the City's Representative. The Contractor shall follow the procedure outlined <br /> in section 1-09.11(2) CONTRACT CLAIMS herein and 1-08.3 PROGRESS <br /> SCHEDULE and 1-08.8 EXTENSIONS OF TIME for issues regarding the schedule <br /> and Contract Time. Timely and adequate Notice is a condition precedent to a Contract <br /> Claim. Timely and complete submission of a Contract Claim is a condition precedent <br /> to any entitlement by the Contractor to an adjustment of Contract Sum or Contract <br /> Time. Unless waived in writing by the City, mediation is a condition precedent to the <br /> filing of any lawsuit, action or proceeding that seeks to recover on a Contract Claim, <br /> whether in whole or in part. The costs of any such mediation will be borne equally by <br /> the parties. Unless otherwise agreed by the parties, the mediation shall take place in <br /> Everett, Washington. <br /> 1-09.11(2) Contract Claims <br /> (******) <br /> 1-09.11(2)A General <br /> If the Contractor requests or believes for any reason that additional compensation I <br /> or an extension of Contract Time is due it, including, but not limited to, breach of <br /> Contract or request for adjustment of Contract Sum or Contract Time, or if the <br /> Contractor has a Dispute with the City and wants the City to take some action, or <br /> refrain from taking action, the Contractor shall file a Contract Claim as provided in <br /> this section. A timely and complete Contract Claim is a condition precedent to any <br /> entitlement by the Contractor to an adjustment of Contract Sum or Contract Time. <br /> No Contract Claim shall be allowed unless the Contractor has given Notice. The <br /> Contractor waives any Contract Claim if: (a) Notice was not timely given; (b) the <br /> City's Representative is not afforded reasonable access by the Contractor to <br /> complete records, including, but not limited to, correspondence, job diaries, and <br /> actual cost and additional time incurred; (c) a Contract Claim is not timely filed as <br /> required by the Contract Documents; or(d) adequate, accurate, contemporaneous <br /> and segregated supporting time and expense records are not kept and <br /> maintained. The fact that the Contractor provided proper and timely Notice, <br /> provided a properly filed Contract Claim, or provided the City's Representative <br /> access to records of actual cost, shall not in any way be construed as proving or <br /> substantiating the validity of the Contract Claim. If the City determines the <br /> Contract Claim has merit in whole or in part, the City's Representative will make <br /> an adjustment of Contract Sum or Contract Time required for the Work, or both. If <br /> the City's Representative finds the Contract Claim to be without merit, no <br /> adjustment will be made. <br /> The Contractor shall keep full, complete, accurate and contemporaneous records <br /> of the costs and additional time incurred for any Contract Claim. The Contractor <br /> shall permit the City's Representative to have access to those records and any <br /> other records as may be required by the City's Representative to determine the <br /> facts or contentions involved in the Contract Claim. City is not obligated to <br /> respond to a Contract Claim unless the Contractor is in full compliance with all the <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP- 118 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.