Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> cost, the rates established by the AGC/WSDOT Equipment <br /> Rental Agreement that was in effect when the Work was <br /> performed. In no case shall the amounts sought or paid for <br /> each piece of equipment exceed the rates established by the <br /> Equipment Rental Agreement even if the actual cost for such <br /> equipment is higher. The City may audit the Contractor's cost <br /> records to determine actual equipment cost. The following <br /> information shall be provided for each piece of equipment: <br /> i. Detailed description (e.g., Motor Grader Diesel <br /> Powered Caterpillar 12 "G", Tractor Crawler ROPS & <br /> Dozer Included Diesel, etc.) <br /> ii. The hours of use or standby; and <br /> iii. The specific day and dates of use or standby; <br /> iv. Job overhead. <br /> v. Overhead (general and administrative). <br /> vi. Subcontractor's Contract Claims (in the same level of <br /> detail as specified herein is required for any <br /> subcontractor's Contract Claims); and <br /> vii. Other categories as specified by the Contractor or the <br /> City. <br /> 10. A notarized statement shall be submitted to the City's Representative <br /> containing the following language: <br /> Under the penalty of law for perjury or falsification, the undersigned, <br /> (name) (title) I <br /> of <br /> (company) I <br /> hereby certifies that the Contract Claim for extra compensation and <br /> extension of Contract Time, if any, made herein for Work on this <br /> Contract is a true and complete statement of the factual basis of the <br /> Contract Claim and all actual costs incurred and time sought, and is <br /> fully documented and supported under the Contract between the <br /> parties. <br /> Date /s/ <br /> Subscribed and sworn before me this day of <br /> 111 <br /> Notary Public <br /> My Commission Expires: <br /> 1-09.11(2)C False Or Omitted Information <br /> The Contractor waives each Contract Claim for which it presents material <br /> information that it knows, or in the exercise of reasonable care should know, is <br /> false, or omits or fails to disclose material information relating to such Contract <br /> Claim. In such case, Contractor shall reimburse the City for any and all fees and <br /> expenses incurred in investigating any such Contract Claim. <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-120 <br />