I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> provisions of the Contract Documents and the formal Contract Claim document <br /> I has been submitted <br /> Full compliance by the Contractor with the provisions of this section is a <br /> contractual condition precedent to the Contractor's right to sue or seek any <br /> I recovery against the City in any legal proceeding. <br /> 1-09.11(2)B Contents <br /> All Contract Claims filed by the Contractor shall be in writing, verified under <br /> I penalty of perjury by an officer or principal of the Contractor, and in sufficient detail <br /> to enable the City's Representative to ascertain the basis and amount of the <br /> Contract Claim. All Contract Claims shall be submitted to the City's <br /> Il Representative. At a minimum, each Contract Claim shall include: <br /> 1. A detailed factual statement of the Contract Claim for additional <br /> compensation and extension of Contract Time, if any, providing all <br /> 1 necessary dates, locations, and items of Work affected by the Contract <br /> Claim. <br /> 2. The dates of all facts related to the Contract Claim. <br /> 1 3. The name of each City's individual, official, or employee involved in or <br /> knowledgeable about the Contract Claim. <br /> 4. The specific provisions of the Contract that support the Contract Claim <br /> Iand a statement of the reasons why such provisions support the Contract <br /> Claim. <br /> 5. If the Contract Claim relates to a decision of the City's Representative <br /> Ithat the Contract leaves to the City's Representative's discretion or as to <br /> which the Contract provides that the City Representative's decision is <br /> final, the Contractor shall set out in detail all facts supporting its position <br /> Irelating to the decision of the City's Representative. <br /> 6. Identification of any documents and the substance of any oral <br /> communications that support the Contract Claim. <br /> I7. Copies of any identified documents that support the Contract Claim, <br /> other than City documents and documents previously furnished to the <br /> City by the Contractor. Standard industry manuals may be incorporated <br /> Iby reference. <br /> 8. If Contractor seeks an extension of Contract Time: <br /> I a. The specific amount of time, including days and dates, sought. <br /> b. The specific reasons the Contractor believes an extension of <br /> Contract Time should be granted, including, but not limited to, <br /> I compliance with the requirements of 1-08.3 PROGRESS <br /> SCHEDULE and 1-08.8 EXTENSIONS OF TIME; and <br /> c. The specific provisions of the Contract Documents under which <br /> it is sought. <br /> I9. If additional compensation is sought, the exact amount sought and a <br /> breakdown of that amount into the following categories: <br /> I a. Labor <br /> b. Materials <br /> c. Direct Equipment. The actual cost for each piece of equipment <br /> I for which a Contract Claim is made or in the absence of actual <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> IWO No—UP3633 SP-119 <br />