My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> than 7-feet above the edge of pavement. The number of necessary signs will be <br /> specified in the Special Provisions. <br /> The Contractor shall provide and install the signs and sign posts. The signs shall be <br /> maintained by the Contractor until construction operations are complete. When the <br /> project includes striping by the Contractor, the signs and posts shall be removed by the <br /> Contractor when the no passing zones are re-established by striping. <br /> When the Contractor is not responsible for striping, the signs and posts shall be <br /> removed by the Contractor when the "No Passing Zones" are re-established by <br /> striping. Payment to perform the Work required for this subsection will be under the <br /> item "Maintenance and Protection of Traffic Control." <br /> 1-10.3(4) Traffic Control Labor <br /> The Contractor shall furnish all personnel for flagging to control traffic during <br /> construction operations. Flaggers shall have a current certification (Flagging Card) <br /> from the State Department of Labor and Industries (WAC 296-155-305). Employees of <br /> the Contractor engaged in flagging or traffic control shall wear reflective vests and hard <br /> hats. During hours of darkness, white coveralls or white or yellow rain gear shall also <br /> be worn. The vests and other apparel shall be in conformance with Section 1-07.8. <br /> The Contractor shall furnish the MUTCD standard Stop/Slow paddles, except the <br /> minimum width shall be 24-inches, for the flagging operations. During hours of <br /> darkness flagger stations shall be illuminated to insure that flaggers can be easily seen <br /> without causing glare to the traveling public. The Contractor shall develop and use a <br /> method to ensure that flaggers have adequate warning of objects approaching from <br /> behind the flagger. <br /> All flaggers shall start a new job with an on-site orientation. This orientation must <br /> include, but not be limited to, the flagger's role and location on the job site, equipment, <br /> traffic patterns, communications and hazards specific to the work site. <br /> If off-duty uniformed police officers are not available for traffic control for Work within <br /> signalized intersections, Contractor may provide four flaggers. Flaggers are not <br /> permitted within the intersection. Each flagger shall control only one approach and be <br /> stationed near the stop bar. Provide a minimum of a series of three warning signs in <br /> advance of each flagger. Narrow multi-lane approaches to a single lane approaching <br /> the flagger. Provide and require all flaggers use two-way radios to signal each other to <br /> prevent conflicts and hold traffic when construction activities require. I <br /> When the Bid proposed includes an item for "Traffic Control Labor," the Work covered <br /> by this item shall be for the labor actually used when authorized by the Engineer for: <br /> 1. The services of flaggers at both ends of a 2-way, single lane operation; or <br /> 2. The services of flaggers at signalized intersections if off-duty uniformed police <br /> officers are not available, or when otherwise specifically directed by the <br /> Engineer. <br /> The hours eligible for "Traffic Control Labor" shall be for the hours actually worked, <br /> plus 1 hour of on-site orientation per flagger. "Show-up time" will not be counted. The <br /> labor to perform the Work described in the item "Maintenance and Protection of Traffic <br /> Control" is specifically excluded from this Work. No adjustment will be made to the unit <br /> price for"Traffic Control Labor" for overtime or holiday hours worked. <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-130 i <br />
The URL can be used to link to this page
Your browser does not support the video tag.