My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 1-10.3(4)A Traffic Control - Off-Duty Police Officer <br /> Provide off-duty uniformed Police Officer for traffic control at all signalized <br /> intersections. Acceptable sources for off-duty uniformed Police Officers are as <br /> follows in order of preference: <br /> 1 1. City of Everett Police Department, contact either, <br /> a. Officer Mike Bernardi, (425) 327-9119 <br /> b. Officer Jack Jessup, (425) 345-9935 <br /> 2. Puget Sound Executive Service, 625 B 5th Ave, Ste 4, Sequim, WA <br /> 98382 <br /> I a. Contact Nick Janssen, (360) 681-7737 <br /> 1-10.3(5) Construction Signs <br /> All signs required by the approved traffic control plan(s) as well as any other <br /> appropriate signs prescribed by the Engineer will be furnished by the Contractor and <br /> be paid under the item "Maintenance and Protection of Traffic Control." The Contractor <br /> shall erect them on posts or supports and maintain them in a clean, neat, and <br /> presentable condition until the necessity for them has ceased. All non-applicable signs <br /> shall be removed or covered with either metal or plywood during periods when they are <br /> not needed. When the need for any of these signs has ceased, the Contractor, upon <br /> approval of the Engineer, shall take down these signs, posts, or supports. All signs, <br /> posts, and supports shall be removed from the project and shall remain the property of <br /> the Contractor. <br /> There shall be no separate classification of signs. All construction signs, whether used <br /> throughout the construction, during a major phase of construction or removed daily <br /> shall be paid under the item "Maintenance and Protection of Traffic Control." Portable <br /> or temporary mountings may require added weight for stability. If it is necessary to add <br /> weight to the signs, only a bag of sand that will rupture on impact shall be used. The <br /> bag of sand shall have a maximum weight of 40 pounds and shall be suspended no <br /> more than 1-foot from the ground. <br /> The Work to provide the construction signing shall be: <br /> 1. Furnishing all construction signs. <br /> l 2. Furnishing, removing, and disposing of the posts or supports for the signs. <br /> 3. Initial installation and subsequent removal of all construction signs. <br /> 4. Furnishing labor and materials for maintaining the signs in a clean and <br /> presentable condition; <br /> 5. All other incidentals necessary for providing the construction signs according <br /> to the approved traffic control plan(s). <br /> Signs, posts, or supports that are lost, stolen, destroyed, or which the Engineer deems <br /> to be unacceptable, while their use is required on the project, shall be replaced by the <br /> Contractor without additional compensation. <br /> 1 1-10.4 Measurement <br /> Delete 1-10.4 and substitute the following: <br /> I <br /> Sewer Regulators R4 and Division 1 -GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No-UP3633 SP- 131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.