Laserfiche WebLink
ICITY OF EVERETT SPECIAL PROVISIONS <br /> No cuts diagonal insidewalk <br /> t will be allowed unless otherwise indicated on the <br /> Plans or directed by the Engineer. <br /> I2-02.3(3)E Removal of Catch Basins, Manholes, Inlets or Sumps <br /> Excavate and completely remove the structure including, but not limited to, casting <br /> I and outlet trap, concrete encasement and bricks, as applicable to each removal <br /> item listed in the Proposal. <br /> Plug existing connecting pipes that remain by filling with Commercial Concrete <br /> I Cement Grout a minimum length of 24—inches into the pipe. Backfill shall be <br /> Gravel Borrow as specified in 9-03.14(1). Compact backfill to a minimum of 95 <br /> percent maximum density in accordance with 2-03.3(14)D. <br /> I 2-02.3(4) Obliteration of Pavement Markings <br /> ( ) <br /> Remove pavement markings where shown on the Plans or where designated by the <br /> I Engineer. Obliterate pavement marking until blemishes caused by the pavement <br /> marking removal conform to the coloration of the adjacent pavement. If the pavement <br /> is materially damaged by pavement marking removal operation, Contractor shall repair <br /> I the pavement damage, at the Contractor's expense, to a condition equal to existing <br /> pavement that had no markings obliterated. Remove sand or other material deposited <br /> on the pavement as a result of removing stripes and markings as the Work progresses <br /> to avoid hazardous conditions. Accumulation of sand or other material that might <br /> interfere with drainage will not be permitted. <br /> 2-02.3(5) Abandon Pipe In-place <br /> Plug pipe ends of pipes designated on Plans being abandoned in-place using <br /> commercial concrete. If designated on Plans, fill abandoned in-place pipe with <br /> I Controlled Density Fill as specified in 2-09.3(1)E. <br /> 2-02.3(6) Sawing and Line Drilling <br /> (******) <br /> I Saw-cut to full depth mortared decorative or special pavement including, but not limited <br /> to, brick, cobblestone or paver block along a neat line with intent of salvaging as many <br /> units as possible. <br /> I When line drilling, drill holes at maximum center-to-center spacing of six-inches. Drill <br /> holes perpendicular to the surface and penetrate completely through the pavement. <br /> When the Plans indicate, or the Engineer requires, saw-cutting pavement that is <br /> I comprised of a rigid base and asphalt overlay, saw cut the rigid base to the minimum <br /> depth as follows: <br /> a. For concrete rigid base, saw cut to a depth of 2/3 the thickness of the rigid <br /> I base. <br /> b. For rigid base constructed with mortared decorative or special pavement <br /> including, but not limited to, brick, cobblestone, or paver block, or a <br /> I combination of such materials saw cut to full depth of the rigid base along a <br /> neat line with intent to salvage as many special pavement units as possible. <br /> 2-02.3(7) Salvage <br /> I (******) <br /> Carefully salvage and deliver to the Owner in good condition, all materials of <br /> recoverable value taken from the discarded facilities, unless otherwise indicated. <br /> I Materials and things deemed of no value by the Engineer shall become the <br /> Contractor's property to be removed and properly disposed. <br /> Sewer Regulators R4 and Division 2—EARTHWORK May 2017 <br /> R39 Modifications <br /> IWO No.-UP3633 SP-137 <br />