CITY OF EVERETT SPECIAL PROVISIONS I <br /> I <br /> If the Engineer determines the job-excavated material unsuitable for backfill then <br /> Contractor shall obtain Gravel Borrow or CDF as directed, to complete backfilling <br /> the voids. If a pay item for Gravel Borrow or CDF is not included in the Proposal, <br /> then providing Gravel Borrow or CDF for backfill shall be considered as Extra <br /> Work under 1-04.4. <br /> 2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and GuttersI <br /> Delete 2-02.3(3)and substitute the following: <br /> 2-02.3(3) Removal of Existing Street Improvements <br /> (******) <br /> 2-02.3(3)A Description <br /> The Work shall consist of the removal and disposal of various existing <br /> improvements including, but not limited to, pavements, curb, curb and gutter, <br /> gutter and other items necessary for the accomplishment of the improvement. <br /> 2-02.3(3)B Removal of Pavement I <br /> Remove full depth existing permanent type pavement and driveway pavement <br /> shown on the Plans or as directed by the Engineer. <br /> Replace, at no expense to the City, existing pavement designated to remain that is <br /> damaged during the pavement or concrete base removal. <br /> 2-02.3(3)B1 Sawcutting <br /> Make vertical full depth saw cut between existing asphalt concrete pavement, <br /> to remain and the portion to be removed. <br /> Where asphalt concrete pavement overlays cement concrete pavement base, <br /> saw cut in accordance with 2-02.3(6) Sawing and Line Drilling. <br /> 2-02.3(3)C Removal of Curb, Curb and Gutter <br /> Remove existing curbs where shown on the Plans or where encountered in the <br /> Work and designated by the Engineer. <br /> Existing curb and gutter includes, but is not limited to, cement concrete, cement <br /> concrete curb with a brick gutter and a cement concrete back, or other <br /> combinations of rigid materials. Remove the entire curb and gutter section, 111 <br /> regardless of material composition. <br /> 2-02.3(3)C1 Sawcutting <br /> Make vertical full depth saw cut between existing curb or curb and gutter to <br /> remain and the portion to be removed. <br /> 2-02.3(3)D Removal of Cement Concrete Sidewalks <br /> I <br /> Concrete slabs that average four-inches or less in thickness will be considered as <br /> sidewalk removal. <br /> Protect existing concrete walk that is to remain in place, from equipment damage <br /> by using planking or cover with rock free eight-inch thick blanket of excavated soil. <br /> Provide Engineer with proposed pavement breakers before use and do not begin <br /> breaking pavement without Engineer's approval of the pavement breakers. <br /> 2-02.3(3)D1 Sawcutting <br /> Make vertical full depth saw cut between existing cement concrete sidewalk <br /> to remain and the portion to be removed at the nearest scribe marks beyond <br /> the neat line limits, or to the nearest joint. <br /> I <br /> Sewer Regulators R4 and Division 2—EARTHWORK May 2017 <br /> R39 Modifications <br /> WO No.-UP3633 SP-136 <br />