Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS III <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> I <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-04 HAUL <br /> 2-04.1 Description <br /> Delete the first paragraph of 2-04.1 and substitute the following: <br /> This Work shall consist of transporting excavated material from its original site to its <br /> final place on the Project or to a Contractor arranged waste site. <br /> 2-04.3 Vacant <br /> Delete 2-04.3 and substitute the following: <br /> 2-04.3 Construction Requirements <br /> Off-highway earth-moving equipment shall not haul on or across streets, roadways, <br /> driveways, trails, sidewalks or parking lots not being improved in the Contract. <br /> 2-04.4 Measurement <br /> Delete all paragraphs under 2-04.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Items Descriptions and provided in Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-04.5 Payment <br /> Delete all paragraphs under 2-04.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-07 WATERING I <br /> 2-07.3 Construction Requirements <br /> Supplement 2-07.3 by adding the following: <br /> Only Everett Public Works Department Water Division personnel and the Project <br /> Inspector may authorize the operation of City fire hydrants or making connections to <br /> City water mains. Upon obtaining City permission, the following shall apply: <br /> 1. Use only those agency designated hydrants in strict accordance with City's <br /> requirements for hydrant use. Obtain a temporary hydrant permit from the <br /> City's Public Works Department Water Division. Temporary hydrant permits IIIare available for a $1,200.00 deposit by contacting the City of Everett's Utility <br /> Billing at 425-257-8999 from 8:00 a.m. to 5:00 p.m. Monday through Friday. <br /> Deposit is refundable. Provide backflow prevention assembly approved by <br /> the City. <br /> 2. Secure permission from and comply with all requirements of the City's water <br /> utility before obtaining water from the fire hydrants. Notify the Engineer of ' <br /> City's permission as soon as granted. <br /> 3. Use hydrant wrenches only to open hydrants. Make certain the hydrant valve <br /> is fully open because "cracking" the hydrant valve causes damage to the <br /> hydrant valve. Provide an approved auxiliary valve on the outlet line for <br /> control purposes. Close fire hydrant valves slowly to avoid a surge in the <br /> system that creates excess pressure on water lines. Carefully note the <br /> importance of following these directions. I <br /> Sewer Regulators R4 and Division 2—EARTHWORK May 2017 <br /> R39 Modifications <br /> WO No.-UP3633 SP-140 <br />