CITY OF EVERETT SPECIAL PROVISIONS <br /> 4. If Contractor's employees use the wrong wrench to open a hydrant causing <br /> damage the hydrant valve stem or operating nut or both, the Contractor shall <br /> be responsible for costs associated with repairing the damaged hydrant valve <br /> stem or operating nut or both. Immediately notify the City's water utility so <br /> that the damage can be repaired as quickly as possible. <br /> 5. Notify City water utility immediately upon completing the use of the hydrants <br /> so the hydrants may be inspected for possible damage. City water utility will <br /> repair damage resulting from the use of the hydrants by the Contractor. <br /> Contractor shall be responsible for repair cost and cost, if necessary, shall be <br /> withheld from the final payment to the Contractor. <br /> 6. City water utility will fine Contractor for violation of these requirements. <br /> Contractor shall also be liable for damage suits resulting from malfunctioning <br /> of Contractor damaged fire hydrants not being operational in the event of fire. <br /> 7. There will be no charge for the volume of water used. <br /> 2-08 VACANT <br /> Revise 2-08 to read as follows: <br /> 2.08 STREET CLEANING <br /> 2-08.1 Description <br /> 1 This Work shall consist of cleaning pavement and removing debris from roadways within <br /> the Project limits and Contractor haul routes. Sweep streets and roadways as needed at <br /> least once per day. Sweep all roadway areas subject to construction traffic within the <br /> Project area and connecting streets, preferably during non-peak use hours of the Project <br /> site. More frequent cleaning may be required, as directed by the City's Inspector, as <br /> conditions warrant. <br /> Spills shall be cleaned up immediately. Failure to clean streets or spills as required will <br /> result in City procuring street cleaning services, or cleaning streets themselves at City <br /> overtime rates. Either way, Contractor shall be responsible for reimbursing the City for cost <br /> incurred. If Contractor fails to promptly reimburse City then City will deduct cost, plus <br /> interest on unpaid balance, from Contractor's final payment. <br /> 2-08.2 Vacant <br /> 2-08.3 Construction Requirements <br /> Provide self-propelled pickup sweepers equipped with water spray systems for dust control <br /> for pavement cleaning and debris removal as required. The use of supplementary water to <br /> suppress dust while performing cleaning Work shall be held to a minimum unless <br /> designated otherwise by the Engineer. <br /> The type and number of sweepers are subject to the approval of the Engineer. <br /> Plan construction operation to minimize the need for street cleaning. <br /> 2-08.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1- <br /> 09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-08.5 Payment <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1- <br /> 1 09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Sewer Regulators R4 and Division 2—EARTHWORK May 2017 <br /> R39 Modifications <br /> WO No.-UP3633 SP-141 <br />