Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 4. If Contractor's employees use the wrong wrench to open a hydrant causing <br /> damage the hydrant valve stem or operating nut or both, the Contractor shall <br /> be responsible for costs associated with repairing the damaged hydrant valve <br /> stem or operating nut or both. Immediately notify the City's water utility so <br /> that the damage can be repaired as quickly as possible. <br /> 5. Notify City water utility immediately upon completing the use of the hydrants <br /> so the hydrants may be inspected for possible damage. City water utility will <br /> repair damage resulting from the use of the hydrants by the Contractor. <br /> Contractor shall be responsible for repair cost and cost, if necessary, shall be <br /> withheld from the final payment to the Contractor. <br /> 6. City water utility will fine Contractor for violation of these requirements. <br /> Contractor shall also be liable for damage suits resulting from malfunctioning <br /> of Contractor damaged fire hydrants not being operational in the event of fire. <br /> 7. There will be no charge for the volume of water used. <br /> 2-08 VACANT <br /> Revise 2-08 to read as follows: <br /> 2.08 STREET CLEANING <br /> 2-08.1 Description <br /> 1 This Work shall consist of cleaning pavement and removing debris from roadways within <br /> the Project limits and Contractor haul routes. Sweep streets and roadways as needed at <br /> least once per day. Sweep all roadway areas subject to construction traffic within the <br /> Project area and connecting streets, preferably during non-peak use hours of the Project <br /> site. More frequent cleaning may be required, as directed by the City's Inspector, as <br /> conditions warrant. <br /> Spills shall be cleaned up immediately. Failure to clean streets or spills as required will <br /> result in City procuring street cleaning services, or cleaning streets themselves at City <br /> overtime rates. Either way, Contractor shall be responsible for reimbursing the City for cost <br /> incurred. If Contractor fails to promptly reimburse City then City will deduct cost, plus <br /> interest on unpaid balance, from Contractor's final payment. <br /> 2-08.2 Vacant <br /> 2-08.3 Construction Requirements <br /> Provide self-propelled pickup sweepers equipped with water spray systems for dust control <br /> for pavement cleaning and debris removal as required. The use of supplementary water to <br /> suppress dust while performing cleaning Work shall be held to a minimum unless <br /> designated otherwise by the Engineer. <br /> The type and number of sweepers are subject to the approval of the Engineer. <br /> Plan construction operation to minimize the need for street cleaning. <br /> 2-08.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1- <br /> 09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-08.5 Payment <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1- <br /> 1 09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Sewer Regulators R4 and Division 2—EARTHWORK May 2017 <br /> R39 Modifications <br /> WO No.-UP3633 SP-141 <br />