My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> IDIVISION 7 — DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, <br /> WATER MAINS, AND CONDUITS <br /> I7-04 STORM SEWERS <br /> 7-04.1 Description <br /> IRevise the first paragraph in 7-04.1 to read as follows: <br /> This Work consists of constructing storm sewers to lines and grades as shown on the <br /> I Plans and in accordance with COE Standard Drawings, the Standard Specifications <br /> and these Special Provisions. <br /> 7-04.2 Materials <br /> I Delete the first and second paragraphs in 7-04.2 and substitute the following: <br /> Use the following pipe materials for storm sewers: <br /> Rigid <br /> IDuctile Iron All sizes <br /> Thermoplastic <br /> l PVC (Polyvinyl Chloride) All sizes <br /> PE Polyethylene All sizes <br /> PP Polypropylene, dual wall 12 to 27 inches <br /> IPP Polypropylene, triple wall 30 inches and above <br /> Materials shall meet the requirements of the following sections: <br /> IReinforced Concrete Storm Sewer 9-05.7(2) Standard Specifications <br /> Pipe <br /> Concrete Storm Sewer 9-05.7(3) Standard Specifications <br /> I Pipe Joints <br /> Solid Wall PVC Storm Sewer Pipe 9-05.12(1) Special Provisions <br /> & Joints <br /> I Profile Wall PVC Storm Sewer Pipe 9-05.12(2) Standard Specifications <br /> & Joints <br /> Corrrigated Polyethylene Storm 9-05.20 Standard Specifications <br /> I Sewer Pipe & Joints <br /> Corrugated Polypropylene Storm 9-05.24 Special Provisions <br /> Sewer Pipe <br /> IRevise the last paragraph in 7-04.2 to read as follows: <br /> When schedule A or B storm sewer pipe is specified in the Plans, provide the specified <br /> I schedule and diameter of either concrete, PVC, or PE/PP materials shown in the <br /> Storm Sewer Pipe Schedules Table. <br /> Contact the Olympia Service Center Materials Laboratory to determine if joints have <br /> I been approved for pipe diameters larger than those listed. <br /> On the web at: http://www.wsdot.wa.gov/biz/mats/QPL/QPI.cfm <br /> Or by mail at: <br /> IP.O. Box 167 <br /> Olympia, WA 98507-0167 <br /> (360) 709-5442 <br /> 111 <br /> Sewer Regulators R4 and Division 7—STORM, SEWER,WATER May 2017 <br /> I R39 Modifications <br /> WO No.—UP3633 SP-153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.