My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS I <br /> 7-04.4 Measurement 1 <br /> Delete the first paragraph of 7-04.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> I <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-04.5 Payment <br /> I <br /> Delete all paragraphs in 7-04.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> I <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-05 MANHOLES, INLETS, AND CATCH BASINS <br /> I <br /> 7-05.1 Description <br /> Revise the first paragraph in 7-05.1 to read as follows: I This Work consists of constructing manholes, inlets, drywells, and catch basins and <br /> connecting to existing Structures of the types and sizes designated in accordance with <br /> the Plans, these Special Provisions, the Specifications, and the COE Standard <br /> I <br /> Drawings, in conformity with the lines and grades staked. <br /> 7-05.2 Materials <br /> Supplement 7-05.2 by adding the following at the end of the material list: <br /> I <br /> Mortar, nonshrink 9-20.3(2) Standard Specifications <br /> Commercial Concrete 6-02.3(2)B Standard Specifications <br /> Watertight Connection Boots 9-05.30 Special Provisions I Flexible Couplings 9-05.40 Special Provisions <br /> Polypropylene Manhole Steps 9-05.64 Special Provisions <br /> & Hand Holds <br /> Polypropylene Manhole Ladder 9-05.66 Special Provisions <br /> 7-05.3 Construction Requirements <br /> Supplement 7-05.3 by adding the following after the last sentence of the third paragraph: <br /> Install PAMREX, East Jordan Iron Works, or equal, hinged manhole frame and cover in <br /> accordance with manufacturer recommendations and applicable City standards and <br /> details. <br /> I <br /> Coordinate manhole cover and frame hinge location with manhole steps and traffic <br /> lanes. Hinge orientation to be determined during the shop drawing review of precast <br /> manhole structures. <br /> I <br /> Supplement 7-05.3 by adding the following to the end of the fourth paragraph: <br /> A field-formed channel and shelf shall not be installed in a manhole until after low <br /> pressure air testing has been successfully completed for all new connected pipes <br /> except where approved in advance by the City. <br /> Delete the tenth paragraph in 7-05.3. <br /> Revise the eleventh paragraph in 7-05.3 to read as follows: I <br /> Provide Kor-N-Seal, or equal, watertight flexible pipe to manhole connectors for pipes <br /> up to 48-inch diameter connecting to new sanitary sewer manholes. Place no pipe <br /> I <br /> joint in PVC or HDPE pipe within 10-feet of the outside face of the manhole. <br /> Revise the last sentence in the sixteenth paragraph in 7-05.3 to read as follows: <br /> Provide manholes, inlets, and catch basins that upon final acceptance of the Work I conforms to the following COE Standard Drawings requirements: <br /> Sewer Regulators R4 and Division 7—STORM, SEWER,WATER May 2017 <br /> R39 Modifications <br /> I <br /> WO No.—UP3633 SP-154 <br />
The URL can be used to link to this page
Your browser does not support the video tag.