My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> opening to accept a watertight flexible pipe to manhole connection in accordance ' <br /> with manufacturer's recommendations. Place upstream pipes, except PVC and <br /> HDPE pipe, penetrating the manhole walls with the bell facing out and snug <br /> against the outside wall of the structure as the angle of penetration allows. <br /> Provide a flexible joint within 1/2 of a pipe diameter or 12-inches, whichever is <br /> greater for pipe, except PVC and HDPE pipe, leaving or entering manholes. <br /> Place pipes entering or leaving the manhole on firmly compacted bedding. Take <br /> particular care in compacting bedding within the area of the manhole excavation <br /> that is normally deeper than the sewer trench. Take special care to ensure the <br /> annual opening around each pipe entering the manhole is completely and firmly <br /> rammed full of non-shrink grout to ensure water tightness. Non-shrink grout shall <br /> conform to requirements of 9-03.20.3(2) of the Standard Specifications. <br /> Provide a watertight flexible pipe to manhole connector for pipe diameters less <br /> than or equal to 24-inches for PVC or HDPE pipes connecting to manhole. Place <br /> no PVC or HDPE pipe joint within 10-feet of the outside face of the manhole. <br /> Supplement 7-05.3 by adding the following: ' <br /> 7-05.3(5) Furnish and Install Solid Lid for Catch Basins <br /> (******) <br /> Provide new solid lids on existing catch basins where shown on the Plans. <br /> Provide solid lids conforming to 9-05.15 of the Standard Specifications, 9-05.15(1) <br /> of these Special Provisions, and to COE Standard Drawing No. 406, 407 and 410 <br /> for Type 1 Catch Basins and COE Standard Drawing 610 for Type 2 Catch Basins. <br /> 7-05.4 Measurement <br /> Delete all paragraphs of 7-05.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-05.5 Payment <br /> Delete all paragraphs of 7-05.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-06 VACANT <br /> Delete 7-06 and substitute the following: <br /> 7-06 SLIDE GATES , <br /> ******) <br /> 7-06.1 Description I <br /> This section covers Open-Channel Stainless Steel Gates and operators. The equipment <br /> provided under this section shall be fabricated, assembled, erected, and placed in proper <br /> operating condition in full conformity with the drawings, specifications, engineering data, <br /> instructions and recommendations of the equipment manufacturer. <br /> Gates and operators shall be supplied with all the necessary parts and accessories <br /> indicated on the drawings, specified, or otherwise required for a complete, properly I <br /> operating installation, and shall be the latest standard product of a manufacturer regularly <br /> engaged in the production of fabricated gates. <br /> Sewer Regulators R4 and Division 7—STORM, SEWER,WATER May 2017 <br /> R39 Modifications <br /> WO No.—UP3633 SP-156 <br />
The URL can be used to link to this page
Your browser does not support the video tag.