My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICITY OF EVERETT SPECIAL PROVISIONS <br /> 1 be anchored with the area bearing on the pipe and on the ground in each instance <br /> being as Shown or directed by the Engineer. Place the blocking, unless otherwise <br /> I shown or directed, so that the pipe and fitting joints, including nuts and bolts, can <br /> be accessible for repair. <br /> 7-09.3(23) Hydrostatic Pressure Test <br /> I Supplement 7-09.3(23) by adding the following: <br /> Provide City approved double-check assembly for the purpose of testing and <br /> flushing. City will not charge for the water used in this operation. <br /> I Successfully complete hydrostatic pressure test prior to starting disinfecting new <br /> water mains. <br /> 7-09.3(23)A Testing Extensions from Existing Mains <br /> IDelete 7-09.3(23)A. <br /> 7-09.3(24) Disinfection of Water Mains <br /> I Delete 7-09.3(24), including subsections, and substitute the following: <br /> 7-09.3(24) Flushing and Disinfection of Water Mains <br /> (******) <br /> I Flush, disinfect with a chlorine solution and obtain passing coliform bacteria test <br /> reports before placing new water mains or extensions to existing mains in service. <br /> Submit flushing and disinfection procedures in accordance with this section. Provide <br /> I submittal containing, at a minimum: <br /> • location of taps and other appurtenances used for chlorination and flushing <br /> purposes, <br /> I • location of the sample collection taps, <br /> • disposal location and treatment procedure for chlorinated water discharged <br /> from the mains, and <br /> I • procedure for disinfection including application method, point of application, <br /> and target concentrations for the contact interval being used. <br /> 7-09.3(24)A Flushing <br /> I Flush sections of pipe being disinfected to remove solids that may have become <br /> lodged in the pipe. Provide a tap sufficient to provide a flush velocity inside the <br /> main of at least 2.5 fps if no hydrant is installed at the end of the main. Flush as <br /> I long as material or color is visible in the discharge. Flush at a minimum one full <br /> pipe volume of water from the section of new main being tested. <br /> Guidelines for Required Flow and Openings to Flush Pipelines <br /> I (assumes 40 psi residual pressure in water main) <br /> Pipe Dia. Flow Required Size of Tap (in) Number of <br /> (in.) to Produce 2.5 21/2" Hydrant <br /> I fps (approx) outlets <br /> Velocity in Main 1 1 1/2 2 <br /> (gpm) (in) (in) (in) <br /> I4 100 1 1 <br /> 6 200 1 1 <br /> 8 400 2 1 1 <br /> I 10 600 3 2 1 <br /> 12 900 2 2 <br /> 16 1,600 4 2 <br /> Sewer Regulators R4 and Division 7—STORM,SEWER,WATER May 2017 <br /> I R39 Modifications <br /> WO No.—UP3633 SP-165 <br />
The URL can be used to link to this page
Your browser does not support the video tag.