CITY OF EVERETT SPECIAL PROVISIONS <br /> Locate the end of each water sample collection tap above existing ground level. <br /> Plumb taps to provide downward water flow to allow effective filling of sample <br /> containers. City EMC staff shall have the authority to refuse to conduct sampling <br /> from taps they consider inadequate or not representative of water main quality. <br /> On mains exceeding 1,200 feet, provide for sample collection at one of the water <br /> services shown on the Plans. If no water services are shown on the Plans, provide <br /> 3/4-inch sampling tap in accordance with COE Standard Drawing No. 525 at <br /> appropriate locations along the main. <br /> For mid-line service taps not providing future customer service, plumb into dead- <br /> end meter setters and meter boxes at the street or sidewalk edge for use as future <br /> dedicated sampling locations in accordance with COE Standard Drawing No. 525. <br /> Locate sample tap upstream of the flushing hose connection for bacterial and <br /> disinfectant residual sampling. Due to sanitary and representative sampling <br /> issues, use only installed sample taps for collection of free chlorine or <br /> bacteriological samples. <br /> 7-09.3(24)J Repetition of Flushing and Testing <br /> Should the initial disinfection procedure result in an unsatisfactory bacteriological <br /> test, meaning total coliform bacteria is present, repeat the entire flushing and <br /> disinfection procedure until obtaining satisfactory test results. Unsatisfactory test <br /> results indicates Contractor's failure to keep the pipe, sample taps, and temporary <br /> filling attachments clean during construction, or to properly flush and disinfect the <br /> main. <br /> Supplement 7-09.3 by adding the following: <br /> 7-09.3(25) Mechanical Joint Restraining Devices <br /> (******) <br /> Restrain joints at bends, tees, dead ends and connections to existing water mains as <br /> shown on the Plans using mechanical joint restraining devices. <br /> 111 <br /> Install joint restraint system in accordance with the manufacturer's recommendations. <br /> 7-09.4 Measurement <br /> Delete all paragraphs of 7-09.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-09.5 Payment <br /> Delete all paragraphs of 7-09.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-10 ACCESS HATCHES <br /> 7-10.1 Description <br /> This section specifies requirements for vault and manhole access hatches. <br /> 7-10.1(1) Quality Assurance <br /> Single source responsibility: Contractor shall obtain access hatches from one <br /> manufacturer. <br /> Coordination: Manufacturer and Contractor shall coordinate design/requirements with <br /> precast concrete supplier. I <br /> Sewer Regulators R4 and Division 7—STORM,SEWER,WATER May 2017 <br /> R39 Modifications <br /> WO No.—UP3633 SP-168 <br />