Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS 1 <br /> Mid Lawn Establishment (after two mowings) 85 percent of individual areas I <br /> Completion of Lawn Establishment 100 percent of individual areas <br /> (after four mowings) I <br /> Bid Item 30 - Cement Concrete Curb and Gutter Type A-1 <br /> Measurement and Payment: Unit Price per Linear Foot <br /> Measurement shall be per linear foot as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> The unit bid price per linear foot of Concrete Curb and Gutter, Type A-1 shall be full <br /> compensation for all labor, equipment, materials, and incidentals, including forms, <br /> necessary to perform the work and shall include the replacement of concrete curbs or curb <br /> and gutter impacted by the construction activities and curb ramp installation in accordance <br /> with the COE Standard Drawings and these Special Provisions. <br /> The cost of sawcutting, removing and disposing of concrete curb and gutter, subgrade <br /> preparation and furnishing, placement, and compaction of crushed rock is incidental and <br /> shall be included in the unit price for this bid item. Installation of curb depressions for 111 <br /> driveway cuts and wheelchair ramps shall be incidental to these items and no separate <br /> payment will be made. <br /> Bid Item 31 - Cement Concrete Sidewalk <br /> Measurement and Payment: Unit Price per Square Yard <br /> Measurement shall be per square yard as delineated by the Contractor and approved by <br /> the Inspector prior to removal. <br /> The unit price per square yard of Cement Concrete Sidewalk shall be full compensation for <br /> replacement or installation of concrete sidewalk, driveway, or alley approach impacted by <br /> construction activities and/or shown on the Contract Plans in accordance with the COE <br /> Standard Drawings and these Special Provisions. <br /> The cost of sawcutting, removing, and disposing of sidewalk and driveways is included in <br /> Roadway Excavation Incl. Haul. <br /> Deductions will be made for blocked out areas, castings, or other discontinuities in the <br /> sidewalk 9 square feet or larger. <br /> The unit contract price for this Bid Item shall include all costs for the work required to <br /> construct the sidewalk as specified. <br /> Bid Item 32 - Cement Concrete Sidewalk Modified <br /> Measurement and Payment: Unit Price per Square Yard. <br /> Measurement shall be per square yard as delineated by the Contractor and approved by <br /> the Inspector prior to removal. <br /> The unit price per square yard of Cement Concrete Sidewalk Modified shall be full <br /> compensation for replacement or installation of concrete sidewalk, driveway, or alley <br /> approach impacted by construction activities and/or shown on the Contract Plans in <br /> accordance with the COE Standard Drawings and these Special Provisions. <br /> The cost of sawcutting, removing, and disposing of sidewalk and driveways is included in <br /> Roadway Excavation Incl. Haul. <br /> Deductions will be made for blocked out areas, castings, or other discontinuities in the <br /> sidewalk 9 square feet or larger. <br /> The unit contract price for this Bid Item shall include all costs for the work required to <br /> construct the sidewalk as specified. I <br /> Sewer Regulators R4 and Division B—BID ITEM DESCRIPTIONS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-14 <br />