Laserfiche WebLink
ICITY OF EVERETT SPECIAL PROVISIONS <br /> 1 4. Manholes to the invert elevation, fully channelized, and cleaned. <br /> 5. Manhole casting set to final grade. <br /> I 6. Manhole construction in accordance with 7-05.3. <br /> 7. Lines free of debris and obstructions. <br /> 8. Bell and spigot joints properly seated as evidenced by successful <br /> completion of CCTV testing. <br /> I9. HDPE bead removal, where required, is accomplished without leaving <br /> sharp and jagged edges. <br /> I 7-17.4 Measurement <br /> Delete both paragraphs of 7-17.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> I described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-17.5 Payment <br /> IDelete all paragraphs of 7-17.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> ISection 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Supplement Division 7 by adding the following Section: <br /> I 7-21 TEMPORARY BYPASS PUMPING <br /> (******) <br /> 7-21.1 Description <br /> I This Work consists of furnishing, installing, and maintaining temporary facilities and <br /> equipment required to maintain the continual wastewater flow and to prevent wastewater <br /> discharge to the environment throughout the duration of constructing new or rehabilitating <br /> Iexisting sanitary sewer or combined sewer mains, or both, within the Project. <br /> 7-21.1(1) Combined Sewer(CS) <br /> The combined sewer (CS) network is generally located in the north portion of the City. <br /> I CS systems are pipes that convey stormwater runoff and wastewater in the same pipe. <br /> Drain inlets in streets and many existing roof drains, and yard drains are connected to <br /> the CS sewer system. Even minor precipitation can produce very sudden and large <br /> Iincreases in sewer flow. <br /> To assist the Contractor in sizing of bypass equipment, Table 7-1 represents flow <br /> estimates, for each of the influent combined sewers approaching the R4 and R39 <br /> I sites. These flows are estimated based on limited flow meter data and hydraulic model <br /> simulation. Bypass gravity pipes, pumps and forcemain pipes shall be sized to <br /> accommodate peak instantaneous flows that are likely to occur during the bypass <br /> I period. The contractor is advised to utilize temporary gravity pipe bypass systems to <br /> the maximum extent possible — especially for wet weather flows. All bypass systems <br /> must consider the possibility of peak flows that might exceed the capacity of the <br /> I bypass system and that resulting "overflows" must be contained or controlled in a <br /> manner that conveys flows to an existing CSO outfall route. Overflows or surcharges <br /> that either spill raw sewage or cause backups into customer laterals are strictly <br /> Iprohibited. <br /> I <br /> Sewer Regulators R4 and Division 7—STORM, SEWER,WATER May 2017 <br /> I R39 Modifications <br /> WO No.—UP3633 SP-179 <br />