My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> IENGINEER'S STATEMENT <br /> 1 The Contract Documents have been prepared under the direction of the Professional Engineers <br /> registered in the State of Washington, whose seals and signatures appear below. <br /> I - ,5 R. G� ��p1CT CUA <br /> 1 OF WAS�I4Cp,� ��4ti OF WAS�II �lf� <br /> ' I , 9 <br /> r //l //1 <br /> �/ _ /? C:1-4- �4 <br /> �i 50 <br /> ` 35928 ' 14k: <br /> I ° � �0 �0 offCST� �+ � S46352 <br /> 4V°.' t v,.<t, # <br /> LISTE <br /> `S G S <br /> iJONAL IONAL c2511g4i.le <br /> IJames R. Gross, PE Peter Benedict Cunningham, PE <br /> Project Manager Project Engineer <br /> IBHC Consultants BHC Consultants <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I • <br /> I <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.