My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICITY OF EVERETT SPECIAL PROVISIONS <br /> ITABLE OF CONTENTS <br /> NOTICE TO CONTRACTORS 1 <br /> 1 DIVISION B — BID ITEM DESCRIPTIONS 3 <br /> DIVISION P — PROPOSAL 17 <br /> I PROPOSAL SIGNATURE SHEET 21 <br /> SUBCONTRACTORS FORM 23 <br /> DISADVANTAGED/WOMEN'S BUSINESS ENTERPRISE 25 <br /> I NON-COLLUSTION AFFIDAVIT 27 <br /> BID DEPOSIT 29 <br /> DIVISION C — CONTRACT 33 <br /> I PAYMENT BOND 37 <br /> PERFORMANCE BOND 39 <br /> DIVISION 1 — GENERAL REQUIREMENTS 41 <br /> IIGeneral Description and Location of Project (******) 41 <br /> Design Engineer (******) 41 <br /> Standard Specifications (******) 41 <br /> I 1-01 DEFINITIONS AND TERMS 42 <br /> 1-02 BID PROCEDURES AND CONDITIONS 46 <br /> 1-03 AWARD AND EXECUTION OF CONTRACT 51 <br /> I 1-04 SCOPE OF THE WORK 53 <br /> 1-05 CONTROL OF WORK 59 <br /> 1-06 CONTROL OF MATERIAL 75 <br /> I 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 77 <br /> 1-08 PROSECUTION AND PROGRESS 92 <br /> 1-09 MEASUREMENT AND PAYMENT 109 <br /> Il-l0 TEMPORARY TRAFFIC CONTROL 128 <br /> 1-11 MISCELLANEOUS (******) 132 <br /> DIVISION 2 — EARTHWORK 135 <br /> I 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP 135 <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 135 <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT 138 <br /> I 2-04 HAUL 140 <br /> 2-07 WATERING - 140 <br /> 2-08 STREET CLEANING (******) 141 <br /> I 2-09 STRUCTURE EXCAVATION 142 <br /> 2-11 TRIMMING AND CLEANUP 143 <br /> DIVISION 4 — BASES 145 <br /> 4-04 BALLAST AND CRUSHED SURFACING 145 <br /> 4-06 ASPHALT TREATED BASE 145 <br /> DIVISION 5 — SURFACE TREATMENTS AND PAVEMENTS 147 <br /> 1 5-04 HOT MIX ASPHALT 147 <br /> 5-06 PAVEMENT PATCHING (******) 150 <br /> I <br /> I <br /> Sewer Regulators R4 and TABLE OF CONTENTS May 2017 <br /> I R39 Modifications <br /> WO No-UP3633 SP-i <br />
The URL can be used to link to this page
Your browser does not support the video tag.