My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 1 — GENERAL REQUIREMENTS <br /> 1 Supplement Division 1 by adding the following: <br /> ' General Description and Location of Project <br /> Work being performed includes furnishing all labor, materials and equipment necessary to <br /> ' construct approximately 200 linear feet of water main and approximately 90 linear feet of <br /> combined sewer main, modifications to an existing combined sewer regulator R39, <br /> construction of a new combined sewer regulator R4, and other such appurtenances and <br /> performing all Work as required by the Contract, in accordance with the Contract Plans and <br /> Contract Provisions. <br /> The Project is in Everett, Washington, and is generally located in Chestnut Street between <br /> Everett Avenue and 26th Street, and at the intersection of 26th Street and Summit Avenue. <br /> Design Engineer <br /> (******) <br /> ' Questions and inquiries about these Contract Documents should be directed to the <br /> attention of Dave Voigt, City Project Manager, phone (425) 257-8983 and Jim Gross of <br /> BHC Consultants, phone (206) 357-9935. <br /> Standard Specifications <br /> (******) <br /> All Work under this Contract shall be performed in accordance with the following <br /> Specifications except as may be exempted or modified by other sections of these Contract <br /> Documents. These Specifications are incorporated by reference, made a part of this <br /> ' Contract and shall control and guide all activities within this Project whether referred to <br /> directly, paragraph by paragraph. <br /> WSDOT/APWA "2016 Standard Specifications for Road, Bridge and Municipal <br /> ' Construction", as amended by the APWA Supplements, hereinafter referred to as the <br /> "Standard Specifications." <br /> The Standard Specifications, as modified or supplemented by the Amendments to the <br /> Standard Specifications and these Special Provisions, all of which are made a part of the <br /> Contract Documents, shall govern all of the Work. The following other specifications and <br /> standard plans shall apply to the extent to which they are called out in these Plans and <br /> Special Provisions. <br /> ' 1. City of Everett"Design and Construction Standards and Specifications", latest <br /> edition as found on the Web at <br /> "http://www.ci.everett.wa.us/GetDoc.aspx?DocID=273." <br /> ' 2. "Standard Plans for Road and Bridge Construction", as prepared by WSDOT. <br /> 3. "Manual on Uniform Traffic Control Devices (MUTCD)." <br /> ' 4. APWA Standards. <br /> 5. AWWA Standards. <br /> Each Provision of these Special Provisions either supplements, modifies, or replaces the <br /> ' comparable Standard Specification, or is a new Provision. The deletion, amendment, <br /> alteration, or addition to any subsection or portion of the Standard Specifications is meant <br /> to pertain only to that particular portion of the section, and in no way should it be interpreted <br /> ' that the balance of the section does not apply. <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> ' WO No—UP3633 SP-41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.