My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 1-04.5 Procedure and Protest by the Contractor <br /> Delete 1-04.5 and substitute the following: <br /> 1-04.5 Notice by Contractor <br /> ******) <br /> 1-04.5(1) When Notice Must Be Given <br /> Whenever: <br /> 1 1. The Contractor disagrees with any requirement, direction, interpretation or <br /> determination by the City or City's Representative; <br /> 2. The Contractor knows, or should with the reasonable exercise of ordinary <br /> care know, of a differing site condition as provided in 1-04.7 DIFFERING <br /> SITE CONDITIONS (CHANGED CONDITIONS); <br /> 3. The Contractor knows, or should with the reasonable exercise of ordinary <br /> care know, of a Delay or an event that may cause a Delay; <br /> 4. The Contractor believes, or with the reasonable exercise of ordinary care <br /> should believe, it is entitled to an adjustment of Contract Sum or Time, even if <br /> the total or exact amount or impact cannot yet be determined; <br /> 5. The Contractor believes it is required or directed to perform work that is <br /> outside the scope of the Contract Documents; or <br /> 6. An event occurs, or fails to occur, that the Contractor believes, or should <br /> reasonably foresee, may result in a Contract Claim; or <br /> 7. The actual quantities of Unit Price Work vary sufficiently from the original <br /> estimate that Contractor may be entitled to an equitable adjustment of <br /> Contract Sum as provided in 1-04.6 VARIATION IN INCREASED OR <br /> DECREASED QUANTIES; <br /> The Contractor shall immediately give Notice to the City or City's Representative as <br /> provided in this section and elsewhere in the Contract Documents and Specifications. <br /> Timely and adequate Notice is a condition precedent to a Contract Claim. <br /> Requests for extensions of Contract Time shall be made and evaluated in accordance <br /> with 1-08.3 PROGRESS SCHEDULE and 1-08.8 EXTENSIONS OF TIME. <br /> Irrespective of any request for additional compensation or Contract Time or a Contract <br /> Claim that Work is extra and not part of the original scope of Work, the Contractor shall <br /> proceed expeditiously and promptly with the Work as the City orders. <br /> If the Contractor fails to follow the procedures of this Contract, including failing to give <br /> Notice, the Contractor completely waives any Contract Claims. In its sole discretion, <br /> the City may waive strict compliance with procedures, but any such waiver of one or <br /> more items or elements does not waive the necessity for Contractor's strict compliance <br /> with any other item or element, nor shall such waiver be admissible in any legal <br /> proceeding for any reason. <br /> 1-04.5(2) Form of Notice <br /> The Notice shall be in writing and include the following minimum information: <br /> 1. A complete and accurate description of the event(s) giving rise to the Notice, <br /> including dates, times, and locations; <br /> 2. A preliminary list of persons involved in such event; <br /> Sewer Regulators R4 and Division 1 -GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No-UP3633 SP-57 <br />