My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> However, if the parties are unable to agree on an adjustment of Contract Sum or <br /> Contract Time, the City's Representative will determine the amount of the adjustment <br /> of Contract Sum or Contract Time. If the City's Representative determines that <br /> differing site conditions do not exist or that no adjustment in Contract Sum or Contract <br /> Time is warranted, such determination shall be final. If there is a decrease in the cost <br /> or time required to perform the Work, failure of the Contractor to notify the City's <br /> Representative of the differing site condition shall not affect the City's right to make an <br /> adjustment in the Contract Sum or Contract Time. Additionally, no Contract Claim or <br /> adjustment of Contract Sum or Contract Time shall be allowed unless the Contractor <br /> has followed the procedures provided for in this Contract, including, but not limited to, <br /> furnishing timely Notice of the event and its effect on Contract Time and Contract Sum <br /> as required herein. <br /> 1-05 CONTROL OF WORK <br /> 1-05.1 Authority of the Engineer <br /> Delete 1-05.1 and substitute the following: <br /> 1-05.1 City <br /> The City, and the City's Representative, shall have the authority to act as the sole judge of <br /> the Work and materials with respect to both quantity and quality as set forth in the Contract. <br /> It is expressly stipulated that the Plans, Specifications and other Contract Documents set <br /> forth the requirements as to the nature of the completed Work and do not purport to control <br /> the method of performing Work except in those instances where the nature of the <br /> completed Work is dependent on the method of performance. <br /> The City has the authority to act, do, perform, and make all decisions and actions <br /> authorized by the Contract Documents, including, but not limited to, Change Orders, <br /> progress payments, contract decisions, acceptability of the Contractor's Work, and early <br /> possession. The City has the authority to accept or reject requests for progress payments <br /> that have been submitted by the Contractor and recommended by the City's <br /> Representative. The City has the authority to make determinations of the acceptability of <br /> the Work. The City also has the authority to accept or reject the City's Representative's <br /> recommendations regarding retention of defective Work. <br /> 1 1-05.2 Authority of Assistants and Inspectors <br /> Delete 1-05.2 and substitute the following: <br /> 1-05.2 City's Representative <br /> (******) <br /> The City's Representative shall be satisfied that all the Work is being done in accordance <br /> with the requirements of the Contract. The Contract and Specifications give the City's <br /> Representative authority over the Work. Whenever it is so provided in this Contract, the <br /> decision of the City's Representative shall be final. <br /> The City's Representative's decisions will be final on all questions including, but not limited <br /> to, the following: <br /> 1. Quality and acceptability of materials and Work; <br /> 2. Measurement of Work, whether lump sum, Force Account, or unit price; <br /> 111 3. Acceptability of rates of progress on the Work; <br /> 4. Interpretation of Plans and Specifications; <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.