Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> IDIVISION B - BID ITEM DESCRIPTIONS <br /> 1 Bid Item 1 - Mobilization and Demobilization R4 Site <br /> Measurement and Payment: Lump Sum <br /> I The lump sum bid for mobilization and demobilization shall constitute complete <br /> compensation for all of Contractor's preconstruction costs of preparatory work and <br /> operations including, but not limited to, those necessary for the movement of his or her <br /> personnel, equipment, supplies and incidentals to the Project; for the establishment of his <br /> Ior her offices, buildings and other facilities necessary for Work on this Project; for premiums <br /> on bonds and insurance for the Project, and for Work and operations that he or she must <br /> perform or costs he or she must incur before beginning production work on the various <br /> I items on the Project. Mobilization and demobilization also includes, but is not limited to, <br /> trimming and cleanup, street cleaning, posting construction identification signs, securing <br /> permits, establishing safety and security measures, preparing a traffic control plan(s), <br /> I collecting preconstruction photographs, developing a Schedule of Values for lump sum bid <br /> items, submitting the project schedule and providing product and material submittals. Also <br /> include mobilization and demobilization costs for all subcontracted work along with all costs <br /> I for utility coordination noted on the Plans and in the Specifications. <br /> Items not included in this item include, but are not limited to: <br /> (a) Work covered by a specific bid item or Work that is to be included in a bid item <br /> I or items. <br /> (b) Profit, interest on borrowed money, overhead or management costs. <br /> Partial payments will be made for the lump sum contract price for "Mobilization and <br /> IDemobilization R4 Site" as follows: <br /> (a) When 5% of the total original contract amount is earned from other bid items, <br /> 50% of the amount bid for mobilization and demobilization, or 5% of the total <br /> original contract amount, whichever is the least, will be paid. <br /> (b) When 10% of the total original contract amount is earned from other bid items, <br /> 50% of the amount bid for mobilization and demobilization, or 5% of the total <br /> I contract amount, whichever is the least, will be paid. <br /> Upon completion of all work on the project, payment of any amount bid for mobilization and <br /> demobilization in excess of 10% of the total original contract amount will be paid. <br /> 1 Bid Item 2 - Mobilization and Demobilization R39 Site <br /> Measurement and Payment: Lump Sum <br /> 1 The lump sum bid for mobilization and demobilization shall constitute complete <br /> compensation for all of Contractor's preconstruction costs of preparatory work and <br /> operations including, but not limited to, those necessary for the movement of his or her <br /> I personnel, equipment, supplies and incidentals to the Project; for the establishment of his <br /> or her offices, buildings and other facilities necessary for Work on this Project; for premiums <br /> on bonds and insurance for the Project, and for Work and operations that he or she must <br /> I perform or costs he or she must incur before beginning production work on the various <br /> items on the Project. Mobilization and demobilization also includes, but is not limited to, <br /> trimming and cleanup, street cleaning, posting construction identification signs, securing <br /> I permits, establishing safety and security measures, preparing a traffic control plan(s), <br /> collecting preconstruction photographs, developing a Schedule of Values for lump sum bid <br /> items, submitting the project schedule and providing product and material submittals. Also <br /> include mobilization and demobilization costs for all subcontracted work along with all costs <br /> Ifor utility coordination noted on the Plans and in the Specifications. <br /> Sewer Regulators R4 and Division B—BID ITEM DESCRIPTIONS May 2017 <br /> I R39 Modifications <br /> WO No—UP3633 SP-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.