CITY OF EVERETT SPECIAL PROVISIONS <br /> Items not included in this item include, but are not limited to: <br /> (a) Work covered by a specific bid item or Work that is to be included in a bid item <br /> or items. <br /> (b) Profit, interest on borrowed money, overhead or management costs. <br /> Partial payments will be made for the lump sum contract price for "Mobilization and <br /> Demobilization R39 Site" as follows: <br /> 111 <br /> (a) When 5% of the total original contract amount is earned from other bid items, <br /> 50% of the amount bid for mobilization and demobilization, or 5% of the total <br /> original contract amount, whichever is the least, will be paid. <br /> (b) When 10% of the total original contract amount is earned from other bid items, <br /> 50% of the amount bid for mobilization and demobilization, or 5% of the total <br /> contract amount, whichever is the least, will be paid. <br /> Upon completion of all work on the project, payment of any amount bid for mobilization and <br /> demobilization in excess of 10% of the total original contract amount will be paid. <br /> Bid Item 3 - Temporary Erosion and Sediment Control I <br /> Measurement and Payment: Lump Sum <br /> Measurement for Temporary Erosion and Sediment Control shall be the ratio of the number <br /> of working days completed to the total number of working days authorized in the Contract. <br /> Temporary Erosion and Sediment Control shall constitute full compensation for all labor, <br /> materials, tools and equipment necessary and incidental for the installation, maintenance <br /> and removal of the temporary erosion and sedimentation control (TESC) facilities to <br /> prevent pollution, erosion, siltation, and damage to any wetland, stream, other watercourse, <br /> or surrounding property throughout the life of the Contract. TESC facilities shall include, <br /> but not be limited to, any cover measures, runoff control measures, soil and site <br /> stabilization measures, filter fabric fencing as shown on the Plans, and inlet protection <br /> measures for the work area and downstream areas. <br /> The TESC measures shall limit the erosion possibility by covering disturbed soils, <br /> preventing sloughing or raveling of cut and natural slopes, and controlling surface runoff <br /> from flowing into excavations using measures such as curbs, berms, dikes, rock-lined <br /> ditches, and other approved measures. Filter fabric fence shall be used to treat small <br /> areas of non-concentrated runoff prior to discharge from the site. <br /> Bid Item 4 - Surveying <br /> Measurement and Payment: Lump Sum <br /> Measurement for surveying will be the ratio of actual pipe installed and backfilled to the <br /> total quantity of pipe listed in the Proposal. <br /> The lump sum bid for surveying includes, but is not limited to, all costs associated with <br /> furnishing all labor, tools, survey instruments materials, and other equipment necessary for <br /> the setting and monitoring the location, elevation, alignment and grade of the Work as <br /> specified in 1-05.4 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES <br /> and the Plans. <br /> The lump sum bid item also includes, but is not limited to, all costs associated with I <br /> furnishing all labor, tools, survey instruments, materials and other equipment necessary for <br /> verifying the rim and invert elevations, prior to construction, of all existing manholes and <br /> pipes where connections are to be made. <br /> The lump sum also includes, but is not limited to, all costs associated with furnishing all <br /> labor, tools, survey instruments, materials and other equipment necessary for obtaining the <br /> "as constructed" location and elevations of the Work, in particular, sewer pipe invert I <br /> Sewer Regulators R4 and Division B—BID ITEM DESCRIPTIONS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-4 <br />