Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 <br /> Equipment originally specified. Reflect cost differential associated with a substitution <br /> in the offer. If the City approves the substitution, the Contract Documents will be I <br /> modified by a Change Order modifying the Contract Sum in the amount of the cost <br /> differential. <br /> 1-06.2 Acceptance of Materials I <br /> 1-06.2(2)B Financial Incentive <br /> Delete 1-06.2(2)B. <br /> 1-06.2(2)D Quality Level Analysis <br /> Delete 1-06.2(2)D. <br /> 1-06.3 Manufacturer's Certificate of Compliance <br /> Supplement 1-06.3 by adding the following: <br /> When authorized by the Standard Specifications or these Special Provisions and prior <br /> to use, the Engineer may accept certain Equipment on the basis of a Manufacturer's I <br /> Certificate of Compliance as an alternate to Equipment inspection and testing. <br /> A Manufacturer's Certificate of Compliance shall be reserved for cases where <br /> compliance to Contract requirements is not readily determinable through inspection I <br /> and testing of materials or Equipment. The Contractor shall provide properly <br /> authenticated documents to the City's Representative that the materials and <br /> Equipment comply with the Contract requirements. III <br /> The Contractor shall pay all associated costs of providing each Manufacturer's <br /> Certificate of Compliance submitted for City acceptance. <br /> The City reserves the right to refuse to accept Equipment on the basis of a <br /> Manufacturer's Certificate of Compliance. <br /> 1-06.3(1) Inspection at Point of Manufacturing <br /> (******) I <br /> The Contractor shall be responsible to reimburse the City for the costs of inspections <br /> at the point of manufacturing for inspections occurring outside of Whatcom, Skagit, <br /> Island, Snohomish, King, Pierce and Thurston counties. Costs to be paid orIll <br /> reimbursed by the Contractor include, but are not limited to, travel, subsistence, labor <br /> and lodging expenses of the City Inspector. <br /> Point of manufacturing inspection will be required if: <br /> Inspection and testing of materials or Equipment in the vicinity of the Work by the <br /> City is not practicable, <br /> The Contractor requests the City to inspect and test material or Equipment at the <br /> point of manufacture, or <br /> The Standard Specifications or these Special Provisions require that inspection, <br /> testing or witnessing of tests take place at the point of manufacture. <br /> 1-06.4 Handling and Storing Materials <br /> Supplement 1-06.4 by adding the following: <br /> Contractor shall store materials and Equipment so as to insure the preservation of their <br /> quality and fitness for the Work. Store Equipment and materials at location that <br /> facilitates inspection. The Contractor shall be responsible for damages, loss or <br /> casualty occurring to materials and Equipment until Final Acceptance. <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 I <br /> R39 Modifications <br /> WO No—UP3633 SP-76 I <br />