My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC <br /> 1-07.1 Laws to be Observed <br /> Revise 1-07.1 by replacing "WSDOT" with "City" in the next to the last sentence of <br /> paragraph three, and Supplement 1-07.1 by adding the following: <br /> The Contractor shall be in compliance with all applicable standards, orders, or <br /> requirements issued under Section 306 of the Clean Air Act [42 U.S.C. 1857(h)], <br /> Section 508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and <br /> Environmental Protection Agency Regulations (40 CFR Part 15). (Contracts, <br /> subcontracts, and subgrants of amounts in excess of$100,000). <br /> The Contractor shall comply with mandatory standards and policies relating to energy <br /> efficiency that are contained in the state energy conservation plan issued in <br /> compliance with the Energy Policy and Conservation Act(Pub. L. 94-163). <br /> The City advises all general contractors and subcontractors that numerous Federal, <br /> State, and Local regulations exist that could affect the procedures used in the <br /> completion of this project. The City advises each prospective Contractor that they are <br /> responsible to be aware of and comply with all applicable statutes and regulations. It <br /> is recommended that each Contractor contact the local office of the following agencies <br /> for a list of applicable regulations and requirements that might affect the <br /> implementation of this project: <br /> • Federal Environmental Protection Agency <br /> • Washington Department of Health <br /> • Washington Department of Ecology <br /> • Washington Department of Fisheries <br /> • Washington Department of Wildlife <br /> • Washington Department of Labor& Industries <br /> • Puget Sound Air Pollution Control Agency <br /> • Municipal Building Department <br /> • Municipal Planning Department <br /> • Municipal Public Works Department <br /> If the scope of Work in this Contract includes Work at the City of Everett Water <br /> Filtration Plant or the Waste Water Pollution Control Facility, Contractor shall comply <br /> with the requirements of the Washington Department of Labor & Industries for such <br /> work including, but not limited to, Chapter 296-67 WAC. All costs associated or <br /> incurred in complying with these regulations or any other regulations listed above are <br /> included in the Contractor's Proposal. <br /> In cases of conflict between different safety regulations, the more stringent regulation <br /> shall apply. <br /> The Washington State Department of Labor and Industries shall be the sole and <br /> paramount administrative agency responsible for the administration of the provisions of <br /> the Washington Industrial Safety and Health Act of 1973 (WISHA). <br /> The Contractor shall maintain at the project site office, or other well-known place at the <br /> project site, all articles necessary for providing first aid to the injured. The Contractor <br /> shall establish, publish, and make known to all employees, procedures for ensuring <br /> immediate removal to a hospital, or doctor's care, persons, including employees, who <br /> may have been injured on the project site. Employees should not be permitted to work <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.