My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> correct prevailing wage and benefit rate(s). The hourly minimum rates for wages <br /> and fringe benefits can be obtained at the following URL: <br /> http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp <br /> Printed copies of the current prevailing wage rates are available for viewing at City <br /> of Everett Public Works, 3200 Cedar St, Everett, WA and the City will mail a hard <br /> copy of the prevailing wage rates upon written request received within 7 days of <br /> the Bid Opening Date. <br /> Delete the fifth paragraph of 1-07.9(1) and substitute the following: I <br /> If employing labor in a class not listed in the L & I prevailing wage rate schedule, <br /> the correct wage and benefits rate for that class and locality from the Industrial <br /> Statistician, Washington State Department of Labor and Industries (State L&I), I <br /> and provide a copy of those determinations to the Project Engineer. <br /> 1-07.9(5) Required Documents <br /> Supplement 1-07.9(5) by adding the following: 111 <br /> The Owner will require payroll reports for the Contractor and every Subcontractor <br /> be submitted weekly to the Construction Division, Public Works Annex, 3101 <br /> Cedar Street, Everett, Washington 98201. The payroll reports shall contain the <br /> following information: <br /> 1. Name and residence address of each worker. <br /> 2. Social Security number of each worker. <br /> 3. Classification of work performed by each worker. The classification shall <br /> be specific and match the classification categories listed in the Contract <br /> Documents. <br /> 4. Total number of hours employed each day. <br /> 5. Total number of hours employed during the payroll period. 111 <br /> 6. Straight time and overtime hourly rate of wages paid to each worker. <br /> 7. Total or gross amount earned by each worker. <br /> 8. Deductions for Medical Aid, FICA, Federal withholding tax, and any other <br /> deductions taken. <br /> 9. Net amount paid each worker. <br /> 10. Contractor's, or Subcontractor's, name and address. <br /> 11. Days and dates worked. <br /> 12. Date of final day of pay period. I <br /> 13. Whether fringe benefits were paid to each worker as part of the hourly <br /> wage rate or whether fringe benefits were paid into an approved plan, <br /> fund, or program. <br /> Payrolls may be submitted on Federal payroll form WH-347, or equivalent. The <br /> reverse side of the form contains an affidavit that shall be filled out and signed. If <br /> the Contractor's payroll reports are computerized, the computerized reports may <br /> be submitted along with a Statement of Compliance affidavit photo copied from <br /> the back of form WH-347, or equivalent. <br /> The first payroll submitted for the Work for both the Contractor and each I <br /> Subcontractor shall be labeled "Initial." The last payroll submitted for the Work for <br /> both the Contractor and each Subcontractor shall be labeled "Final." Payrolls <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 I <br /> R39 Modifications <br /> WO No—UP3633 SP-80 i <br />
The URL can be used to link to this page
Your browser does not support the video tag.