My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 1-07.18(5)E Excess or Umbrella Liability <br /> IThe Contractor shall provide Excess or Umbrella Liability coverage at limits of <br /> $1,000,000 million per occurrence and annual aggregate. This excess or umbrella <br /> liability coverage shall apply, at a minimum, to both the Commercial General and <br /> IAuto insurance policy coverage. <br /> This requirement may be satisfied instead through the Contractor's primary <br /> Commercial General and Automobile Liability coverage, or any combination <br /> Ithereof. <br /> 1-07.18(5)F Pollution Liability <br /> I The Contractor shall provide a Pollution Liability policy, providing coverage for <br /> claims involving bodily injury, property damage (including loss of use of tangible <br /> property that has not been physically injured), cleanup costs, remediation, <br /> I disposal or other handling of pollutants, including costs and expenses incurred in <br /> the investigation, defense, or settlement of claims arising out of: <br /> Contractor's operations related to this project; <br /> I Remediation, abatement, repair, maintenance or other work with lead-based paint <br /> or materials containing asbestos; and <br /> Transportation of hazardous materials away from any site related to this project. <br /> I Such Pollution Liability policy shall provide the following minimum coverage: <br /> $2,000,000 each loss and annual aggregate <br /> 1-07.18(5)G Professional Liability <br /> IThe Contractor, its Subcontractor and its design consultant providing construction <br /> management, value engineering, or other design-related non-construction <br /> professional services shall provide evidence of Professional Liability insurance <br /> I covering professional errors and omissions. Such policy shall provide the <br /> following minimum limits: <br /> $2,000,000 per Claim <br /> IIf the scope of such design-related professional services includes work related to <br /> pollution conditions, the Professional Liability insurance shall include Pollution <br /> Liability coverage. <br /> IIf insurance is on a claims made form, its retroactive date, and that of all <br /> subsequent renewals, shall be no later than the effective date of this Contract. <br /> 1 1-07.18(5)H Builder's Risk <br /> If the Project includes construction of a structure, the Contractor shall maintain <br /> property insurance under an "All Risk Builder's Risk" form in an amount equal to <br /> I the value of the structure in a form acceptable to the City. The structure shall <br /> have All Risk Builder's Risk Insurance inclusive of earthquake and flood subject to <br /> customary industry deductibles. <br /> I 1-07.20 Patented Devices, Materials, and Processes <br /> Delete the first paragraph of 1-07.20 and substitute the following: <br /> The Contractor shall assume all costs arising from the use of patented devices, <br /> I materials, or processes used on or incorporated in the Work, and agrees to indemnify, <br /> defend, and save harmless the City, and its officers, employees and agents from all <br /> actions of any nature for, or on account of the use of any patented devices, materials, <br /> Ior processes. <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.