My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 7/25/2017 Change Order 1
>
Contracts
>
Capital Contract
>
Kassel & Associates 7/25/2017 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2017 11:31:08 AM
Creation date
8/18/2017 11:31:07 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
7/25/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP Ops Bldg Seismic Retrofit
Public Works WO Number
UP3600
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000567
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/28/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: WFP Operations Building Seismic Retrofit-Rebid <br /> Change Order No.001 <br /> Change Order Effective Date: 7/10/17 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax,the amount of the change order for <br /> the changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A,including all direct and indirect costs and impacts. The contract <br /> price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts, Washington State sales tax, if applicable to the <br /> Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order,the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order,including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition,protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> _AAAA 1- <br /> De: 4/ityCle� Date: �� �/�— Date: .4.Vi/;— <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> ,f %/• ot ! / <br /> i / <br /> LA <br /> Date: 7/A%/7 Date: 2 .'i ate: D:t (`') <br /> WFP Operations Building Seismic Retrofit- 'ebid July 07,2017 <br /> WO#UP3600 006363 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.