Project: WFP Operations Building Seismic Retrofit - Rebid <br /> Change Order No.001 <br /> Change Order Effective Date: 7/10/17 <br /> CONTRACTOR <br /> By Date: 7o/fes Officer <br /> Exhibit A - Description of Changed Work <br /> Work Change Directive —No. 003 — Modify Installation of Anchor Rods and Place <br /> Grout in Empty Cells for Second Floor Precast Floor Panels: WCD —No. 003 is a <br /> force account revision for $8,000.00 and the addition of 10-working days. <br /> Justification: - The existing record drawings show the hollow core cells in the second <br /> floor precast floor panels to be grouted. During construction it was found that the <br /> majority of the cells were only partially grouted or not grouted at all. Due to the lack of <br /> grouting additional investigation of the cells was necessary. Anchor rod installation was <br /> modified by adding screens, epoxy and anchor rods. Grouting of the empty cells was <br /> necessary. Payment is for the additional work required to investigate existing conditions <br /> and modify the installation of the seismic strengthening on the second floor. <br /> Work Change Directive—No. 004—Mechanical Chase Revisions: WCD—No. 004 <br /> was agreed to in the lump sum amount of$8,761.00 and the addition of 3 -Working <br /> Days. <br /> Justification: - Seismic strengthening was required in a mechanical chase on the <br /> second floor. Second floor demolition plan does not show demolition in the mechanical <br /> chase. Second floor seismic strengthening plan does not show installation of <br /> strengthening in the mechanical chase. Payment is for the additional work needed to <br /> demo and restore the mechanical chase. <br /> Work Change Directive —No. 005 —Remove Additional Roofing Above Room 216: <br /> WCD—No. 005 was agreed to in the lump sum amount of$361.15 and 0-Working <br /> Days. <br /> Justification: - Prior to the plant expansion in 1993, room 216 was an exterior room <br /> and was roofed. After the 1993 expansion room 216 became an interior room. The <br /> WFP Operations Building Seismic Retrofit-Rebid July 07,2017 <br /> WO#UP3600 006363 -3 <br />