My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 6/26/2017 Change Order 2
>
Contracts
>
Capital Contract
>
Marshbank Construction 6/26/2017 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2017 10:47:42 AM
Creation date
8/21/2017 10:47:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
6/26/2017
Department
Public Works
Department Project Manager
Grace Kane
Subject / Project Title
41st ST to W Marine View Dr Freight Corridor
Public Works WO Number
PW3472
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0000049
Total Compensation
$212,714.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 5/9/2016
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: 41st St to WMVD Freight Corridor Improvements <br /> Change Order No.2 <br /> Change Order Effective Date: June 15, 2017 <br /> CONTRACTOR <br /> By L1 •P Date: 1�� 7 <br /> Officer <br /> Exhibit A - Description of Changed Work <br /> This Change Order# 2 adds four(4)new bid items, modifies two (2) existing bid items, and adds <br /> fifteen(15)working days to the Contract as shown below. <br /> Added Bid Items <br /> Bid Item # 77—Equitable Adjustment for Utility Delays. Add new item# 77 entitled, "Equitable <br /> Adjustment for Utility Delays"at the agreed to lump sum price of$26,050.00, by adding $26,050.00 to <br /> the Contract, resulting in a$26,050.00 increase to the Contract price. <br /> Bid Item # 78—Vehicle Loop Detector Installation. Add new item# 78 entitled, "Vehicle Loop <br /> Detector Installation" at the agreed to unit price of$924.00/Each, by adding 22 each vehicle detector <br /> loops to the Contract, resulting in a$20,328.00 increase to the Contract price. <br /> Bid Item # 79—HMA Class '/2 Inch, PG 64-22 Pavement Patch. Add new item# 79 entitled, <br /> "HMA Class Y2 Inch PG 64-22 Pavement Patch" at the agreed to unit price of$127.25/Ton, by adding <br /> 250 tons to the Contract, resulting in a$31,812.50 increase to the Contract price. <br /> Bid Item#80—Cement Concrete Extruded Curb. Add new item# 80 entitled, "Cement Concrete <br /> Extruded Curb"at the agreed to unit price of$10.64/Linear Foot, by adding 350 linear feet to the <br /> Contract, resulting in a$3,724.00 increase to the Contract price. <br /> Total Cost for Added Bid Items: $81,914.50 <br /> Modified Bid Items <br /> Bid Item #21 —Commercial HMA. Modify existing bid item# 21 entitled, "Commercial HMA" at <br /> the Contract unit price of$114.00/Ton, by adding 700 tons to the Contract, resulting in a$79,800.00 <br /> increase to the Contract price. <br /> Bid Item#37—Flaggers and Spotters. Modify existing bid item# 37 entitled, "Flaggers and <br /> Spotters" at the Contract unit price of$51/Hour, by adding 1,000.00 hours to the Contract, resulting in <br /> a$51,000.00 increase to the Contract price. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.